Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Maintenance dredge of approx., eight hundred (800) CY of material to approximately a depth of minus five foot (-5') mean low water line, twenty-five feet (25') wide by five hundred (500') long from the channel marker. Remove the old channel markers and install two (2) new piles as well as the signs. Restore the existing seawall with new seawall installed against existing seawall, and replenish riprap at the jetties to the original approved design. Install seawall along the inside of channel directly adjacent to existing steel seawall. Installed system shall be comparable to the existing vinyl seawall construction, including stainless steel tiebacks and an aluminum cap.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
The brunswick harbor entrance channel advanced maintenance widener o&m dredging contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. Approximately two million cubic yards of maintenance material is expected to be removed from the advanced maintenance wideners and adjacent entrance channel.
Posted Date
Sep 26, 2025
Due Date
Dec 19, 2025
Release: Sep 26, 2025
Close: Dec 19, 2025
The brunswick harbor entrance channel advanced maintenance widener o&m dredging contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. Approximately two million cubic yards of maintenance material is expected to be removed from the advanced maintenance wideners and adjacent entrance channel.
AvailablePipeline Maintenance Dredging of the Matagorda Ship Channel. Schedule 1 includes dredging of approx. 1,738,000 cubic yards (CY) of the Matagorda Ship Channel, Sections 1 thru 11. Option 1 includes dredging of approx.1,879,000 cubic yards (CY) of the Matagorda Ship Channel, Sections 12 thru 22. Additional time of 108 calendar days. Option 2 includes dredging of approx.159,000 cubic yards (CY) of the Gulf Intracoastal Waterway, Sections 23 thru 24.
Posted Date
Dec 3, 2025
Due Date
Dec 18, 2025
Release: Dec 3, 2025
Close: Dec 18, 2025
Pipeline Maintenance Dredging of the Matagorda Ship Channel. Schedule 1 includes dredging of approx. 1,738,000 cubic yards (CY) of the Matagorda Ship Channel, Sections 1 thru 11. Option 1 includes dredging of approx.1,879,000 cubic yards (CY) of the Matagorda Ship Channel, Sections 12 thru 22. Additional time of 108 calendar days. Option 2 includes dredging of approx.159,000 cubic yards (CY) of the Gulf Intracoastal Waterway, Sections 23 thru 24.
The Contract work consists of maintenance dredging of approximately 80,000 CY of sediment within the Little River federal navigation channel.
Posted Date
Dec 4, 2025
Due Date
Dec 19, 2025
Release: Dec 4, 2025
Close: Dec 19, 2025
The Contract work consists of maintenance dredging of approximately 80,000 CY of sediment within the Little River federal navigation channel.
AvailableHarbor maintenance dredging. Remove approx. 180,000 CY of accumulated sediment across the three project features.
Posted Date
Oct 17, 2025
Due Date
Nov 5, 2028
Release: Oct 17, 2025
Close: Nov 5, 2028
Harbor maintenance dredging. Remove approx. 180,000 CY of accumulated sediment across the three project features.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis