Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Pipeline Maintenance Dredging of the Matagorda Ship Channel. Schedule 1 includes dredging of approx. 1,738,000 cubic yards (CY) of the Matagorda Ship Channel, Sections 1 thru 11. Option 1 includes dredging of approx.1,879,000 cubic yards (CY) of the Matagorda Ship Channel, Sections 12 thru 22. Additional time of 108 calendar days. Option 2 includes dredging of approx.159,000 cubic yards (CY) of the Gulf Intracoastal Waterway, Sections 23 thru 24.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
FY26 GIWW Maintenance Dredging. Pipeline maintenance dredging and advanced maintenance dredging of the Bay. Schedule 1 will include GIWW maintenance dredging of approx. 1.5 million cubic yards (CY) of the Bay and will include varying advanced maintenance depths. Material will be placed across various placement areas located along the GIWW. This contract will be subject to several environmental windows, including bird nesting, turtle nesting, and piping plover.
Posted Date
Nov 10, 2025
Due Date
Aug 4, 2026
Release: Nov 10, 2025
Close: Aug 4, 2026
FY26 GIWW Maintenance Dredging. Pipeline maintenance dredging and advanced maintenance dredging of the Bay. Schedule 1 will include GIWW maintenance dredging of approx. 1.5 million cubic yards (CY) of the Bay and will include varying advanced maintenance depths. Material will be placed across various placement areas located along the GIWW. This contract will be subject to several environmental windows, including bird nesting, turtle nesting, and piping plover.
AvailableThe U.S. Army Corps of Engineers, Galveston District, solicits competitive proposals for pipeline dredging and maintenance work along the Gulf Intracoastal Waterway from Corpus Christi Bay to Port Isabel with an additional channel to Harlingen, Texas. The procurement covers dredging operations across multiple South Texas counties (Nueces, Kleberg, Kenedy, Willacy, and Cameron) under NAICS 237990 and is unrestricted (no set-aside). Proposals are due May 22, 2026 and interested contractors should use the SAM.gov posting and PIEE links referenced by the original posting to access full solicitation documents and vendor access instructions.
Posted Date
Oct 28, 2025
Due Date
May 22, 2026
Release: Oct 28, 2025
Close: May 22, 2026
The U.S. Army Corps of Engineers, Galveston District, solicits competitive proposals for pipeline dredging and maintenance work along the Gulf Intracoastal Waterway from Corpus Christi Bay to Port Isabel with an additional channel to Harlingen, Texas. The procurement covers dredging operations across multiple South Texas counties (Nueces, Kleberg, Kenedy, Willacy, and Cameron) under NAICS 237990 and is unrestricted (no set-aside). Proposals are due May 22, 2026 and interested contractors should use the SAM.gov posting and PIEE links referenced by the original posting to access full solicitation documents and vendor access instructions.
Release: Oct 28, 2025
Close: May 22, 2026
Pipeline dredging.
AvailableThe brunswick harbor entrance channel advanced maintenance widener o&m dredging contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. Approximately two million cubic yards of maintenance material is expected to be removed from the advanced maintenance wideners and adjacent entrance channel.
Posted Date
Sep 26, 2025
Due Date
Dec 19, 2025
Release: Sep 26, 2025
Close: Dec 19, 2025
The brunswick harbor entrance channel advanced maintenance widener o&m dredging contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. Approximately two million cubic yards of maintenance material is expected to be removed from the advanced maintenance wideners and adjacent entrance channel.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis