Summary
Project consists of supplying the labor, equipment, and materials necessary to remove and replace five hundred (500) residential water service lines at separate Locations throughout the City. The work is to be completed over a 5-year period with 100 services minimum replaced each year. Work includes investigating existing conditions, and installing new water service tubing with tracer wire, excavation, fittings, and other necessary appurtenance for a complete water service line replacement from the water main connection to the water meter for each location. Other various related site tasks include but not limited to: backfilling, testing of backfill compaction, pavement removals and replacements, pavement testing, traffic control, disinfection, testing, grading and seeding.