Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Escanaba Area Public Schools issued an RFP (ID RFP-EAPS-260000000534-1) for the reconstruction of a school kitchen serving line. The solicitation was posted on 2025-12-10 and the response deadline is listed as 2026-01-07; HigherGov estimates the project value at $50,000–$200,000. HigherGov does not host documents for this opportunity and identifies Michigan's SIGMA Vendor Self-Service (Advantage4) as the official source; the SIGMA listing must be searched by the Opportunity ID to access original documents.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
High school serving line upgrade. ITEM #1 Pizza Line Quantity 1 CounterCraft Model No. SCSL-192-MOD - Modular piece 'fully enclosed base' style construction with utility chase within counter. All electrical conduit to be located within utility chase as required. Utility chase to be fully accessible from operator side of counter with electrical to be located removable stainless steel panels.
Posted Date
-
Due Date
Jan 6, 2026
Release: -
Close: Jan 6, 2026
High school serving line upgrade. ITEM #1 Pizza Line Quantity 1 CounterCraft Model No. SCSL-192-MOD - Modular piece 'fully enclosed base' style construction with utility chase within counter. All electrical conduit to be located within utility chase as required. Utility chase to be fully accessible from operator side of counter with electrical to be located removable stainless steel panels.
Premium
Access the largest public sector contact database
High school serving line upgrade. ITEM #1 Pizza Line Quantity 1 CounterCraft Model No. SCSL-192-MOD - Modular piece 'fully enclosed base' style construction with utility chase within counter. All electrical conduit to be located within utility chase as required. Utility chase to be fully accessible from operator side of counter with electrical to be located removable stainless steel panels.
Posted Date
-
Due Date
Jan 6, 2026
Release: -
Close: Jan 6, 2026
High school serving line upgrade. ITEM #1 Pizza Line Quantity 1 CounterCraft Model No. SCSL-192-MOD - Modular piece 'fully enclosed base' style construction with utility chase within counter. All electrical conduit to be located within utility chase as required. Utility chase to be fully accessible from operator side of counter with electrical to be located removable stainless steel panels.
AvailableReplacement of the sanitary sewer line and the associated street reconstruction of approx. 600 LF.
Posted Date
Dec 3, 2025
Due Date
Dec 17, 2025
Release: Dec 3, 2025
Close: Dec 17, 2025
Replacement of the sanitary sewer line and the associated street reconstruction of approx. 600 LF.
AvailableWork includes full depth paving reconstruction, sidewalk, water line, sanitary sewer line, storm drain including inlets, reinforced concrete pipe and box culvert, and headwalls; pavement marking and signing, crosswalk buttons, illumination, landscape, hardscape including specialty pavement finishes and colors, brick pavers, tree grates and street furniture; and irrigation
Posted Date
Nov 24, 2025
Due Date
Dec 18, 2025
Release: Nov 24, 2025
Close: Dec 18, 2025
Work includes full depth paving reconstruction, sidewalk, water line, sanitary sewer line, storm drain including inlets, reinforced concrete pipe and box culvert, and headwalls; pavement marking and signing, crosswalk buttons, illumination, landscape, hardscape including specialty pavement finishes and colors, brick pavers, tree grates and street furniture; and irrigation
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis