Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes : disconnect and remove 2-compartment sink to eliminate direct waste connection; furnish and install one 12" round floor sink with half grate and dome strainer; modify waste piping in ceiling below to eliminate direct waste connection; perform core drilling as necessary; re-install 2-compartment sink after flooring finishes; provide water proofing and patch existing flooring, matching the existing finishes as closely as possible; see attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Seeking a qualified and experienced contractor to provide and install a new flooring system for our commercial kitchen. The project includes the removal of the existing flooring, surface preparation, the installation of a new, high- performance, and compliant floor system, or surface preparation over the existing flooring, installation of a new, high-performance, and compliant floor system.
Posted Date
Nov 20, 2025
Due Date
Dec 16, 2025
Release: Nov 20, 2025
Close: Dec 16, 2025
Seeking a qualified and experienced contractor to provide and install a new flooring system for our commercial kitchen. The project includes the removal of the existing flooring, surface preparation, the installation of a new, high- performance, and compliant floor system, or surface preparation over the existing flooring, installation of a new, high-performance, and compliant floor system.
AvailableWork includes repair, replacement and installation of resilient floor covering.
Posted Date
Aug 25, 2025
Due Date
Jan 15, 2026
Release: Aug 25, 2025
Close: Jan 15, 2026
Work includes repair, replacement and installation of resilient floor covering.
AvailableFloor Installation Services for Low-income Public Housing Properties Scattered Sites.
Posted Date
Oct 26, 2025
Due Date
Dec 18, 2025
Release: Oct 26, 2025
Close: Dec 18, 2025
Floor Installation Services for Low-income Public Housing Properties Scattered Sites.
AvailableInstallation and removal of carpet floor mats, carpet tiles, vinyl tiles, supplies and accessories.
Posted Date
Nov 19, 2025
Due Date
Dec 23, 2025
Release: Nov 19, 2025
Close: Dec 23, 2025
Installation and removal of carpet floor mats, carpet tiles, vinyl tiles, supplies and accessories.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis