Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Kitchen floor replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Lower level drain tile installation at high school.
Posted Date
Jan 6, 2026
Due Date
Jan 23, 2026
Release: Jan 6, 2026
Close: Jan 23, 2026
Lower level drain tile installation at high school.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of a comprehensive, turnkey, five-year hyperconverged infrastructure with micro segmentation and backup system, including all necessary compute, storage, network, software, and licensing.
Posted Date
Dec 23, 2025
Due Date
Jan 28, 2026
Release: Dec 23, 2025
Close: Jan 28, 2026
Procurement of a comprehensive, turnkey, five-year hyperconverged infrastructure with micro segmentation and backup system, including all necessary compute, storage, network, software, and licensing.
AvailableFloor Replacement for Main Gym.
Posted Date
Jan 16, 2026
Due Date
Feb 18, 2026
Release: Jan 16, 2026
Close: Feb 18, 2026
Floor Replacement for Main Gym.
AvailableLee’s Summit R-7 School District is soliciting bids for the HVAC replacement and related renovations at Lee’s Summit North High School, 901 NE Douglas St, Lee’s Summit, Missouri. Work includes general construction, structural, mechanical, and electrical components to complete the replacement. A pre-bid is indicated on the planroom calendar, and bids are due January 29, 2026.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Lee’s Summit R-7 School District is soliciting bids for the HVAC replacement and related renovations at Lee’s Summit North High School, 901 NE Douglas St, Lee’s Summit, Missouri. Work includes general construction, structural, mechanical, and electrical components to complete the replacement. A pre-bid is indicated on the planroom calendar, and bids are due January 29, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →