Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Person County
Work includes construction and installation of a new ada-compliant elevator system, connecting the auditorium basement to the auditorium stage level. Design and construction of new ada-compliant restroom facilities within the auditorium section of the complex. Review of existing building conditions and coordination with county personnel for access and staging. Structural modifications to accommodate the new elevator shaft and equipment. Construction of elevator shaft and installation of all elevator components (electrical, mechanical, control systems). Integration with fire and life safety systems in compliance with local codes. Interior finish work and restoration around elevator installation areas. See outside link.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Town of Kentwood
Construct a new restroom facility at our community park. The project at the park restroom will involve a new, modern facility that meets current accessibility standards. Contractors with experience in public facility construction, including ada compliance and relevant building codes.
Posted Date
Jul 21, 2025
Due Date
Dec 4, 2025
Release: Jul 21, 2025
Town of Kentwood
Close: Dec 4, 2025
Construct a new restroom facility at our community park. The project at the park restroom will involve a new, modern facility that meets current accessibility standards. Contractors with experience in public facility construction, including ada compliance and relevant building codes.
AvailableCity of South Fulton
Furnish and install inclusive, ADA-compliant playground equipment.
Posted Date
Sep 5, 2025
Due Date
Dec 16, 2025
Release: Sep 5, 2025
City of South Fulton
Close: Dec 16, 2025
Furnish and install inclusive, ADA-compliant playground equipment.
AvailableTown of Wakefield
Reconstruction of 3,600 LF of ADA-Compliant Sidewalk. Removal and proper disposal of existing sidewalk, curb, and gutter where required. Reconstruction of approx. 3,600 LF of ADA-compliant sidewalk (width per local standards, typically 5 feet minimum). Construction of new curb ramps, detectable warning surfaces, and transitions at driveways and intersections per ADA guidelines. Adjustment of utilities (manholes, valve boxes, etc.) to grade as necessary. Restoration of disturbed areas including landscaping, turf, or pavement. Coordination with local utility providers and municipal departments. Traffic control and flagging per [MUTCD] standards. All permitting and inspections required by local jurisdiction. Compliance with stormwater, erosion, and sediment control requirements.
Posted Date
Nov 7, 2025
Due Date
Jan 30, 2026
Release: Nov 7, 2025
Town of Wakefield
Close: Jan 30, 2026
Reconstruction of 3,600 LF of ADA-Compliant Sidewalk. Removal and proper disposal of existing sidewalk, curb, and gutter where required. Reconstruction of approx. 3,600 LF of ADA-compliant sidewalk (width per local standards, typically 5 feet minimum). Construction of new curb ramps, detectable warning surfaces, and transitions at driveways and intersections per ADA guidelines. Adjustment of utilities (manholes, valve boxes, etc.) to grade as necessary. Restoration of disturbed areas including landscaping, turf, or pavement. Coordination with local utility providers and municipal departments. Traffic control and flagging per [MUTCD] standards. All permitting and inspections required by local jurisdiction. Compliance with stormwater, erosion, and sediment control requirements.
Ysleta Independent School District
Fine arts professional services.
Posted Date
Sep 20, 2023
Due Date
Oct 31, 2027
Release: Sep 20, 2023
Ysleta Independent School District
Close: Oct 31, 2027
Fine arts professional services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis