Special DistrictTX
Posted
-
Dec 1, 2026
Construction of Water Plant No. 1 RFP
Work includes construction of water plant.
Description: Demolition of existing MCC Building, buried solution lines and conduit, distribution pumps and pad, LAS building foundation, diesel containment structure, suction header, discharge header, select distribution piping, asphalt service drive, and electric conductor feeds. Construction of yard piping, suction and discharge headers, discharge meters and conduit, reinforced concrete foundations and pads, plumbing and conduit sleeves, motor control, distribution pumps and chlorinator building, furnish and install distribution pumps and motors, furnish and install chlorination equipment, supply and solution lines, relocate existing liquid ammonium sulfate (LAS) building and tank, furnish and install LAS equipment, supply and solution lines, reinforced concrete service drive areas and sidewalks, final site grading and hydromulch seeding, and cleanup at end of project. Electrical, MCC, HMI/SCADA and natural gas generator will be constructed under a separate contract and will be coordinated and constructed concurrently with this project.
SpecialDistrict · TX, US
Adjacent opportunities open for bidding right now.
Special DistrictTX
Posted
-
Dec 1, 2026
Work includes construction of water plant.
Special DistrictTX
Posted
Nov 13, 2026
Dec 9, 2026
INVITATION TO BIDDERS Sealed bids, in duplicate, addressed to Board of Directors, Harris County Municipal Utility District No. 49, will be received at the office of BGE, Inc., 10777 Westheimer, Suite 500; Houston, Texas, 77042 (Phone: 281-558-8700) OR electronically through www.civcastusa.com, until 10:30 AM Local Time, Wednesday, December 9, 2026, at which time all bids will be opened and publicly read at the office of BGE, Inc. and through Microsoft Teams. The Call-in number is (832) 680-2579 and the Conference ID is 724 536 187# for the furnishing of all material, equipment, labor and supervision necessary or incidental to “Construction of Water Plant No. 1 Improvements for Harris County MUD No. 49, Harris County, Texas.” Scope of Project: The scope of the project at the Water Plant 1 improvements includes the rehabilitation and recoating of the interior and exterior of the existing Ground Storage Tanks No. 1, No. 2, and No.3; remove and replace gate valves at Ground Storage Tanks and Booster Pump Station; remove and replace cathodic protection at Ground Storage Tanks No. 2 and No. 3; rehabilitation and recoating of the interior and exterior of the existing Hydropneumatic Tanks No. 1 and No. 2; rehabilitation and recoating of aboveground piping; construction of MCC Building with a restroom; replacement of diesel emergency generator with natural gas generator and replacement of generator pad; yard piping; installation of 12” surface water fill lines to all ground storage tanks; upsizing existing overflow piping to 16” on all ground storage tanks; upsizing existing suction line to 16” on Ground Storage Tank No. 1 and Booster Pump No. 4; replacement of chemical building; replacement of sodium hypochlorite (NaOCl) system; construction of NaOCl storage pad and canopy; replacement of blended phosphate system; additional liquid ammonium sulfate (LAS) pumps and piping; installation of total monochloramine and ammonia analyzers; replacement of eyewash/safety shower; replacement of altitude valve with flow control valve on surface water line; installation of flow meter on surface water line; replacement of MCC and other electrical equipment; in accordance with the contract plans and specifications. Bids received after closing time will be returned unopened. A non-mandatory pre-bid conference will be held on Wednesday, December 2, 2026, at 10:30 AM Local Time, remotely through Microsoft Teams. To join via Microsoft Teams the Call-in number is (832) 680-2579 and the Conference ID is 704 051 408#. Plans, specifications and bid documents are available at www.civcastusa.com, search: 15520-00. A Bidder submitting Electronic Bids must submit its Bid and bid securities in compliance with Owner’s Order Adopting Section 49.2731 Electronic Bidding Rules and all Bids and bid securities must be submitted through www.civcastusa.com. A cashier’s check or bid bond in the amount of 5% of the total bid amount must accompany each bid. The successful bidder will be required to provide performance, payment and maintenance bonds for the full amount of the contract. The Owner reserves the right to reject any or all bids.
CityAL
Posted
Nov 13, 2026
Dec 16, 2026
Principal items of work include surface preparation and painting of all interior and exterior surfaces of the existing 75,000-gallon multi-column elevated water storage tank (Tank No. 1), including full draping/containment, removal and disposal of existing coatings (anticipated to contain lead), relocation of the AMI antenna to a new welded mount, catwalk, handrail and overflow modifications, and related miscellaneous repairs.
Special DistrictTX
Posted
Nov 4, 2026
Nov 25, 2026
Work includes re-coating of facilities at the water plant. Preparation and coating of the interior and exterior surfaces of the two (2) 15,000-gal. hydropneumatic tanks onsite, preparation and coating of the well header piping, preparation and coating of the exterior of the cmu block building on site, including the recoating of all exterior doors, preparation and coating of all exterior piping associated with the two (2) ground storage tanks, including fill lines, overflow lines, etc. See attached file.
Solicitation files and supporting documents for this bid.