Summary
Work consists of: 138 SY, geotextiles, as required in base repair; 40 TN, PennDot No.2A stone applied as base repair or grade adjustment, as directed; 1,294 TN, superpave asphalt mixture design hma wearing course, pg 64-22, 0-0.3 million ESAL's, 9.5mm mix, including scratch course; 48 TN, superpave asphalt mixture design hma base repair, pg 64-22, 0-0.3 million ESAL's, 25mm mix; 12,348 SY, milling of asphalt pavement surface 1-1/2-IN depth (milled material to be retained by contractor); Miscellaneous incidental work. Includes removal of any excessive vegetation along roadway, restoration of lawns and adjacent landscaped areas, painting curbs, and all other items not specified herein. Includes all materials, labor and equipment to complete. See outside link.