Summary
The project includes construction of major stormwater and roadway improvement, the scope of work generally includes: removal and replacement of asphalt pavement from 4th street to civic circle. Installation of new curb, gutter, and sidewalk at designated locations. Replacement of an existing waterline. Construction of a new storm sewer system, including pipe of various diameters, manholes, inlets, slotted drain, and an outlet structure. Construction of a stormwater detention facility adjacent to civic circle within the berryman farm subdivision. Minor restoration of an existing retention pond located at w. Clark street and ash street. All associated labor, materials, equipment, traffic control, erosion control, restoration, and incidental work necessary to complete the project.