Kamehameha HWY Intersection Improvements Kuala St (Request for Information)
Description: Installation of traffic signals, resurfacing, repairing/reconstruction of weakened pavement; installation of concrete pavement; upgrading of existing guardrails; addition of drain lines and storm drain structures; pavement marking and signage; highway lighting upgrades and other site improvements required to complete this project.
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
Converting the existing intersection into a single-lane roundabout (central island, truck apron, circular path and splitter islands); roadway stabilization; pavement reconstruction; landscaping improvements; electrical conduits and highway lighting; drainage improvements; installing Americans with Disabilities Act compliant sidewalks, curb ramps, and roadway crossings; installing chain link fences; installing signage and pavement marking; work zone traffic control and/or detour roads; and adjusting and relocation of various utilities, as necessary.
From the first pre-RFP signals to the published RFP and its files.
2 files available
Strategic plan
The SHSP recorded state and district programmes covering pavement, drainage, traffic signals, intersection improvements, guardrails, pedestrian facilities, and highway lighting.
See 3 sourcesHide sources
1.6.5 Strategies or Projects to Address Safety Issues Ensuring consistency in the long-term vision of the State of Hawaii's land transportation system is vital. It is important to improve coordination between jurisdictions, existing programs, and overarching master plans to target the highest priority needs. The plan identifies the following existing…
1. Improve Safety 2 6 a. Infrastructure Projects: i. Install 25 miles Milled Shoulder & Centerline Rumble Strips ii. Install 150 miles of 6-Inch Edge Line iii. Install 7 miles of new guardrail iv. Install 1 miles of new median barrier v. Perform High Friction Surface Treatment (HFST) at 8 locations vi. Install 40 new raised crosswalks/speed table/speed hump…
a. Infrastructure Projects: i. Install 25 miles Milled Shoulder & Centerline Rumble Strips ii. Install 150 miles of 6-Inch Edge Line iii. Install 7 miles of new guardrail iv. Install 1 miles of new median barrier v. Perform High Friction Surface Treatment (HFST) at 8 locations vi. Install 40 new raised crosswalks/speed table/speed hump vii. Lower the posted…
Hawai'i Department Of Transportation Strategic Highway Safety Plan 2025-2029