Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Expansion to the existing substation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes site grading; transmission line tap (tubular steel); h-frame substation deadend and static mast (tubular steel) installation; concrete foundation, fence, ground grid, and conduit installation; removal of existing substation east fence; steel structure erection; bus conductor and equipment installation; and distribution underground equipment installation. Energized work is not anticipated.
Posted Date
Jan 7, 2026
Due Date
Feb 10, 2026
Release: Jan 7, 2026
Close: Feb 10, 2026
Work includes site grading; transmission line tap (tubular steel); h-frame substation deadend and static mast (tubular steel) installation; concrete foundation, fence, ground grid, and conduit installation; removal of existing substation east fence; steel structure erection; bus conductor and equipment installation; and distribution underground equipment installation. Energized work is not anticipated.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of replacement of the main high-voltage electrical substation including replacement of disconnects, circuit breakers, surge arresters, transformers and medium-voltage switchgear; demolition of the existing carpenter shop, installation of a new structural foundation and piles, hazardous material abatement, demolition of the existing substation area, completion of related site work and restoration of the existing substation area to a topsoiled area.
Posted Date
Dec 16, 2025
Due Date
Feb 12, 2026
Release: Dec 16, 2025
Close: Feb 12, 2026
Project consists of replacement of the main high-voltage electrical substation including replacement of disconnects, circuit breakers, surge arresters, transformers and medium-voltage switchgear; demolition of the existing carpenter shop, installation of a new structural foundation and piles, hazardous material abatement, demolition of the existing substation area, completion of related site work and restoration of the existing substation area to a topsoiled area.
AvailableSubstation Line Extension Project work includes 1 EA furnish & install 8' * 20' * 9' - 4" traffic rated vault with (1) manhole & 5' * 8' opening per CU 1600-3L complete vault installation and surface restoration; 2 EA furnish and install 8' * 14' * 9' - 4" traffic rated vault with (1) manhole & 5' * 8' opening per CU 1600-3K. Complete vault installation and surface restoration; see attached file.
Posted Date
Jan 29, 2026
Due Date
Mar 12, 2026
Release: Jan 29, 2026
Close: Mar 12, 2026
Substation Line Extension Project work includes 1 EA furnish & install 8' * 20' * 9' - 4" traffic rated vault with (1) manhole & 5' * 8' opening per CU 1600-3L complete vault installation and surface restoration; 2 EA furnish and install 8' * 14' * 9' - 4" traffic rated vault with (1) manhole & 5' * 8' opening per CU 1600-3K. Complete vault installation and surface restoration; see attached file.
AvailablePublic works/engineering building expansion project.
Posted Date
Jan 5, 2026
Due Date
Feb 4, 2026
Release: Jan 5, 2026
Close: Feb 4, 2026
Public works/engineering building expansion project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →