Summary
Site exterior, existing control building: install two VFDS for existing digested sludge pumps, install new digested sludge pumps, process piping modifications, update/modify main control panel and SCADA system as needed to accommodate new dewatering equipment. Dewatering building: demolish concrete reaction tank, mixer, and appurtenances. Demolish sludge feed pump and piping. Demolish plate and frame press, access platforms. Demolish shaftless screw conveyors. Demolish motor control center. Install polymer feed skid system. Install new volute press, including structural support and access platform. Install new dewatered sludge hopper. Install new sludge dehumidification system. Install four new shaftless screw conveyors. Floor slab modifications and concrete equipment pads. Replace roof exhaust fan. HVAC ductwork modifications and infill wall lovers. HVAC controls modifications and install new split ac system for electrical room. New exterior wall louvers for dehumidifier condenser exhaust fans. Floor drain and plumbing modifications. Replace overhead door motorized opener. Replace exterior hollow metal personnel doors. Electrical and controls modifications associated with new process equipment. Along with miscellaneous improvements, removals, restoration, and correlated appurtenances.