CountyMO
Posted
Sep 29, 2026
Oct 26, 2026
Johnson County Bridge Replacement RFP
The proposed work includes the construction of a 67'-7 7/8" long, single span, w33x118 steel I-girder bridge at 20-degree R.A. Skew and -6. 88% grade.
Description: The proposed work includes the construction of a 67'-7 7/8" long, single span, w33x118 steel I-girder bridge at 20-degree R.A. Skew and -6. 88% grade.
County · MO, US
Decision makers connected to this RFP from Johnson County.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
460 days before RFP
The Commission approved an extension to McClure Engineering's design agreement for the NW 1771st Road bridge replacement, requiring final PS&E approval by MoDOT by October 31, 2025.
Supplemental Agreement to Extend Work Deadline for BRO-R050(42) NW 1771st Rd over Blackwater Commissioner Kavanaugh moved, with Commissioner Sproat seconding, to approve Supplemental Agreement No. 4 to the Engineering Services Contract dated March 20, 2023, between Johnson County and McClure Engineering for the design of the NW 1771st Road Bridge…
Johnson County Commission Proceedings
Board meeting · Jun 26, 2025
Board meeting
397 days before RFP
Johnson County reviewed and signed right-of-way clearance documents and requested review of remaining right-of-way clearances for Bridge 2870004.
BRO-R051(42); Bridge No. 2870004 on NW 1771st Rd over Blackwater South Fork The Commissioners reviewed and signed the Right of Way Clearance Certification Statement and the Right of Way Submittal and requested that all remaining Right of Way clearances be reviewed to ensure contractual deadlines are met for Project BRO-R051(42), Bridge No. 2870004 on NW…
Johnson County Court Record
Board meeting · Aug 28, 2025
Board meeting
288 days before RFP
Johnson County identified the need to issue an RFQ for construction engineering services to finish Bridge 2870004.
McClure Engineering Commissioner Matthews and Kavanaugh met with Aaron McVicker who reviewed current projects: • BRO-R051 (42) Bridge. No. 2870004 on NW 1771st Rd over South Fork of Blackwater: o Water Line Relocation: Because Public Water Supply District #2 is on their own private easement, they are entitled to payment for relocation because of the…
Johnson County Court Record Of Proceedings
Board meeting · Dec 15, 2025
Board meeting
281 days before RFP
Johnson County approved a supplemental engineering agreement and a $17,620 county-paid utility relocation for Bridge 2870004.
Bridge 2870004 Replacement on NW 1771st Road over South Fork of Blackwater River, BRO-R051(42) Supplemental Agreement No. 6 to Engineering Services Contract Commissioner Kavanaugh moved and Commissioner Sproat seconded to approve and authorize Presiding Commissioner Matthews to sign the Supplement Agreement for Bridge 2870004 BRO-R051(42) (NW 1771st Road…
Johnson County Court Record Of Proceedings
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (1 days left)
10:00 a.m. Waiver of Requirements of Competitive Proposals for GIS Parcel Maintenance Services from Surveying and Mapping, LLC Consideration of Request for Qualifications (RFQ) -- Engineering Services for Bridge 2870004 over South Fork of Blackwater on NW 1771st Road
Johnson County Commission Notice Of Open Meeting
Meeting agenda · Jul 28, 2026
Board meeting · Dec 22, 2025
Adjacent opportunities open for bidding right now.
CountyMO
Posted
Sep 29, 2026
Oct 26, 2026
The proposed work includes the construction of a 67'-7 7/8" long, single span, w33x118 steel I-girder bridge at 20-degree R.A. Skew and -6. 88% grade.
Ohio Department of Transportation
State AgencyOH
Posted
-
Oct 29, 2026
Work includes: in accordance with plans and specifications by removing an existing single-span steel bridge, abutments, and approach slabs and replacing with a single-span prestressed concrete box beam structure, semi-integral abutments on capped piles, and new approach slabs. Project also includes minor asphalt paving at approaches, guardrail upgrades, erosion control improvements and other related work. Major items feature 723.000 SY of pavement removal; 191.000 FT of guardrail removed; 55.000 CY of excavation; 57.000 CY of embankment; 150.000 FT of guardrail, type MGS; 911.000 SY of pavement planing, asphalt concrete; 43.000 CY of asphalt concrete base; 11.000 EA of prestressed concrete composite box beam bridge members; and 147.000 SY of reinforced concrete approach slabs.
Ohio Department of Transportation
State AgencyOH
Posted
-
Oct 29, 2026
Work includes: in accordance with plans and specifications by removing an existing single-span steel bridge, abutments, and approach slabs and replacing with a single-span prestressed concrete box beam structure, semi-integral abutments on capped piles, and new approach slabs. Project also includes minor asphalt paving at approaches, guardrail upgrades, erosion control improvements and other related work. Major items feature 723.000 SY of pavement removal; 191.000 FT of guardrail removed; 55.000 CY of excavation; 57.000 CY of embankment; 150.000 FT of guardrail, type MGS; 911.000 SY of pavement planing, asphalt concrete; 43.000 CY of asphalt concrete base; 11.000 EA of prestressed concrete composite box beam bridge members; and 147.000 SY of reinforced concrete approach slabs.
Virginia Department of Transportation
State AgencyVA
Posted
-
Nov 18, 2026
Work include 180 LF 15" storm sewer pipe; 41 LF 18" storm sewer pipe; 69 LF 24" storm sewer pipe; 17,293 CY excavation; 1,084 CY siltation control excavation; 334 LF temp. Silt fence type b; 12,168 LF rumble strip cylindrical asphalt; 14,579 LF saw-cut asphalt concrete (18 in. Depth); 153 CY conc. Cl. A4 bridge appr. Slab const. ; 4,931 CY structure excavation const; 217 LF bridge substructure rock socket drilled shaft (48" dia).