Summary
The project will include installation of new 18"-60" storm sewer piping and drainage structures; new 8” sanitary sewer main piping and manholes; new 8" and 12" water mains; reconnecting sanitary sewer and water services; relocation of existing utilities where necessary; saw-cutting and demolition of existing road and parking lots; milling and overlay portions of existing road; new full-depth pavement and curb and gutter for road and parking lots; new sidewalks; installation of a retaining wall; re-striping and re-signing roadway and parking lots; traffic control; erosion control (installation, maintenance, and removal); and permanent stabilization.