Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes clearing and grubbing, grading, grinding existing asphalt concrete, paving with new asphalt concrete, reconstruction of curb, gutter, and curb ramps to meet current ada standards, construction of new sidewalk, installation of new pedestrian street lights, installation of thermoplastic striping and markings, installation of traffic signs and posts, installation of new catch basin, and adjustment of utility manhole frames, covers and other utility boxes to finished grade and other work as shown on plans or as specified in the specifications.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Parsley Boulevard Greenway project includes installation of 640 LF of new 10-foot wide concrete sidewalk, removal of curb, gutter and sidewalk, installation of curb and gutter with asphalt patch, replacement of asphalt drive approach and installation of crushed base at alley, installation of drainage appurtenances and relocation of signage and Greenway fence.
Posted Date
Dec 11, 2025
Due Date
Jan 13, 2026
Release: Dec 11, 2025
Close: Jan 13, 2026
Parsley Boulevard Greenway project includes installation of 640 LF of new 10-foot wide concrete sidewalk, removal of curb, gutter and sidewalk, installation of curb and gutter with asphalt patch, replacement of asphalt drive approach and installation of crushed base at alley, installation of drainage appurtenances and relocation of signage and Greenway fence.
AvailableThis RFP is for the installation of Brightleaf Boulevard and Narrows Road Sidewalk Improvements-Phase 2.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
This RFP is for the installation of Brightleaf Boulevard and Narrows Road Sidewalk Improvements-Phase 2.
AvailableProject consists of constructing two (2) new sewer manholes over existing sewers at the intersection of Westminster Boulevard and Springdale Street, and includes (a) removal of conflicting existing 8" VCP sewer and (b) construction of two (2) 48" diameter PVC Lined Manholes. The project will also require (but not be limited to): protecting existing utilities; coordination with utility owners, shoring, dewatering, maintaining the existing sewer flows during construction, traffic control, pavement resurfacing, slurry seal pavement as required, traffic restriping, replacement of traffic loop detectors and installation of raised pavement markers and appurtenant work.
Posted Date
Nov 21, 2025
Due Date
Jan 20, 2026
Release: Nov 21, 2025
Close: Jan 20, 2026
Project consists of constructing two (2) new sewer manholes over existing sewers at the intersection of Westminster Boulevard and Springdale Street, and includes (a) removal of conflicting existing 8" VCP sewer and (b) construction of two (2) 48" diameter PVC Lined Manholes. The project will also require (but not be limited to): protecting existing utilities; coordination with utility owners, shoring, dewatering, maintaining the existing sewer flows during construction, traffic control, pavement resurfacing, slurry seal pavement as required, traffic restriping, replacement of traffic loop detectors and installation of raised pavement markers and appurtenant work.
Pasco County (Board of County Commissioners) issued an RFSQ seeking design and post‑design services for Sunlake Boulevard from Center Village Drive to south of Appenzeller Boulevard, covering surveys, design plans, permitting, and coordination with county stakeholders. The solicitation (Ref. RSQ‑BW‑26‑019) was posted on 2025‑12‑18 and is open with a submission deadline of 2026‑01‑27; questions are due 2026‑01‑09. Supporting solicitation documents are available on the Bonfire portal but require a Bonfire account to download.
Posted Date
Dec 18, 2025
Due Date
Jan 27, 2026
Release: Dec 18, 2025
Close: Jan 27, 2026
Pasco County (Board of County Commissioners) issued an RFSQ seeking design and post‑design services for Sunlake Boulevard from Center Village Drive to south of Appenzeller Boulevard, covering surveys, design plans, permitting, and coordination with county stakeholders. The solicitation (Ref. RSQ‑BW‑26‑019) was posted on 2025‑12‑18 and is open with a submission deadline of 2026‑01‑27; questions are due 2026‑01‑09. Supporting solicitation documents are available on the Bonfire portal but require a Bonfire account to download.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.