Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Missouri Department of Transportation
Work includes 68 LF preformed thermoplastic pavement marking, 6". White; 18,532 LF 4" White class 1 pavement marking paint (18-mil, type P beads); 3,802 LF 4" Yellow class 1 pavement marking paint (18-mil, type P beads); 33,436 SY coldmilling bituminous pavement for removal of surfacing (3". Thick or less); 3,669 tons asphaltic concrete mixture PG 70-22 (SP125C mix); 48 tons gravel (A) or crushed stone (B).
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Missouri Department of Transportation
Work includes 65,184 SY misc. Coldmilling existing pavement; 1,858 SY modified coldmilling (depth transitions); 1,809 LF 8 in. White class 1 pavement marking paint (18-mil, type p beads); 25,928 LF 4". Yellow class 1 pavement marking paint (18-mil, type P beads); 32,599 LF 6". White class 2 pavement marking paint (25-mil, type L beads); 8 EA preformed thermoplastic pavement marking, 24" X 36", yield line triangle; 660 LF preformed thermoplastic pavement marking, 24" White.
Posted Date
Nov 6, 2025
Due Date
Dec 12, 2025
Release: Nov 6, 2025
Missouri Department of Transportation
Close: Dec 12, 2025
Work includes 65,184 SY misc. Coldmilling existing pavement; 1,858 SY modified coldmilling (depth transitions); 1,809 LF 8 in. White class 1 pavement marking paint (18-mil, type p beads); 25,928 LF 4". Yellow class 1 pavement marking paint (18-mil, type P beads); 32,599 LF 6". White class 2 pavement marking paint (25-mil, type L beads); 8 EA preformed thermoplastic pavement marking, 24" X 36", yield line triangle; 660 LF preformed thermoplastic pavement marking, 24" White.
AvailableMissouri Department of Transportation
Work includes 262,040 LF 4" White class 1 pavement marking paint (18-mil, type P beads); 15 EA. preformed thermoplastic pavement marking, left/right arrow; 204,363 LF 4" Yellow class 1 pavement marking paint (18-mil, type p beads); 3178 SY coldmilling bituminous pavement for removal of surfacing (3" Thick or less); 19,459 SY modified coldmilling (depth transitions); 2186 STA bituminous shoulder rumble strip; 1256 STA bituminous centerline rumble strip; 45 LF misc. Shaping slopes, class III-modified material requirement.
Posted Date
Nov 6, 2025
Due Date
Dec 12, 2025
Release: Nov 6, 2025
Missouri Department of Transportation
Close: Dec 12, 2025
Work includes 262,040 LF 4" White class 1 pavement marking paint (18-mil, type P beads); 15 EA. preformed thermoplastic pavement marking, left/right arrow; 204,363 LF 4" Yellow class 1 pavement marking paint (18-mil, type p beads); 3178 SY coldmilling bituminous pavement for removal of surfacing (3" Thick or less); 19,459 SY modified coldmilling (depth transitions); 2186 STA bituminous shoulder rumble strip; 1256 STA bituminous centerline rumble strip; 45 LF misc. Shaping slopes, class III-modified material requirement.
AvailableMissouri Department of Transportation
Work includes 1,900 SF cleaning and epoxy coating; 744. 000 sqyd seal coat aggregate, grade b1l; 129 emulsified asphalt, seal coat; vgvb; mgs guardrail, 8 ft. Posts, 6' - 3" Spacing; 301,655 LF 4" White class 1 pavement marking paint (18-mil, type p beads); 22. 000 lf; temporary removable marking tape, 24" , white; 2000 LF temporary removable marking tape 4" , yellow; 200 EA. channelizer (trim-line); 2,489 gal prime-liquid asphalt MC 800; 509 LF curb blackout.
Posted Date
Nov 6, 2025
Due Date
Dec 12, 2025
Release: Nov 6, 2025
Missouri Department of Transportation
Close: Dec 12, 2025
Work includes 1,900 SF cleaning and epoxy coating; 744. 000 sqyd seal coat aggregate, grade b1l; 129 emulsified asphalt, seal coat; vgvb; mgs guardrail, 8 ft. Posts, 6' - 3" Spacing; 301,655 LF 4" White class 1 pavement marking paint (18-mil, type p beads); 22. 000 lf; temporary removable marking tape, 24" , white; 2000 LF temporary removable marking tape 4" , yellow; 200 EA. channelizer (trim-line); 2,489 gal prime-liquid asphalt MC 800; 509 LF curb blackout.
AvailableMissouri Department of Transportation
Work includes 21,767 LF pavement marking removal; 15,771 LF preformed thermoplastic pavement marking, 24" White; 2 EA. changeable message sign with communication interface, contractor furnished /retained.
Posted Date
Nov 6, 2025
Due Date
Dec 12, 2025
Release: Nov 6, 2025
Missouri Department of Transportation
Close: Dec 12, 2025
Work includes 21,767 LF pavement marking removal; 15,771 LF preformed thermoplastic pavement marking, 24" White; 2 EA. changeable message sign with communication interface, contractor furnished /retained.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis