Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Westwood Regional High School
Project generally consists of the replacement of existing unit ventilators throughout as well as the replacement of the existing pneumatic controls with new controls (trane tracer)/thermostats. Work includes, but is not limited to the following: removal and disposal of existing unit ventilators, piping, fin tube, etc. Installation of new unit ventilators, lintels, steel, etc. Modification of roof for new condensing unit(s) & exhaust fans. Replacement of shelving along the exterior walls with new. Mechanical, plumbing, electrical, fire alarm, and data modifications, relocations and installation associated with new units. Provide existing convectors with new control valves and wall mounted thermostats.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Brookwood School District 167
Provide mechanical rooftop unit replacement.
Posted Date
Nov 13, 2025
Due Date
Dec 10, 2025
Release: Nov 13, 2025
Brookwood School District 167
Close: Dec 10, 2025
Provide mechanical rooftop unit replacement.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Englewood Cliffs School District
Project generally consists of replacement of the existing two rooftop mechanical units serving the upper gym. This work includes, but is not limited to the following: removal and disposal of existing rooftop units, ductwork, accessories, etc. New electric panels, distribution, and connections to existing. Installation of new hvac units including all duct and utility connects, controls, curbs, roof modifications, etc.
Posted Date
Nov 12, 2025
Due Date
Dec 9, 2025
Release: Nov 12, 2025
Englewood Cliffs School District
Close: Dec 9, 2025
Project generally consists of replacement of the existing two rooftop mechanical units serving the upper gym. This work includes, but is not limited to the following: removal and disposal of existing rooftop units, ductwork, accessories, etc. New electric panels, distribution, and connections to existing. Installation of new hvac units including all duct and utility connects, controls, curbs, roof modifications, etc.
AvailableCajon Valley Union School District
Work consists of playground replacement project at elementary school. Work includes, remove and haul away existing cushioning materials. Excavate area to minimum depth of 16"; provide & install 4" depth 3/4" drainage rock, drainfelt and minimum depth of 12" cushioning chips; remove and haul away existing playground equipment; remove and haul away existing asphalt and concrete border to allow for new expansion of existing project; install new compliant ramp as needed to meet all ADA requirements.
Posted Date
Nov 6, 2025
Due Date
Dec 9, 2025
Release: Nov 6, 2025
Cajon Valley Union School District
Close: Dec 9, 2025
Work consists of playground replacement project at elementary school. Work includes, remove and haul away existing cushioning materials. Excavate area to minimum depth of 16"; provide & install 4" depth 3/4" drainage rock, drainfelt and minimum depth of 12" cushioning chips; remove and haul away existing playground equipment; remove and haul away existing asphalt and concrete border to allow for new expansion of existing project; install new compliant ramp as needed to meet all ADA requirements.
AvailableHurst-Euless-Bedford Independent School District
Project consists of elementary school replacement. See outside link.
Posted Date
-
Due Date
Dec 17, 2025
Release: -
Hurst-Euless-Bedford Independent School District
Close: Dec 17, 2025
Project consists of elementary school replacement. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →