Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes removal of 760' of 8" concrete truss pipe sanitary sewer main to be replaced with 8" pvc pipe. Depth is generally between 8 and 12' but includes less than 100 feet at depths greater than 15'. Includes the replacement or relocation of 3 manholes and reconstruction of golf cart path; replacement of 1,645' of 8" concrete truss pipe sanitary sewer main with 8" curvilinear hdpe pipe including horizontal and vertical curves, connection of laterals, re-construction of paved golf cart/ access roadway, grading, and surface restoration. Pipe depth varies between 4 and 20'.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes sanitary sewer improvements project.
Posted Date
Nov 13, 2025
Due Date
Dec 22, 2025
Release: Nov 13, 2025
Close: Dec 22, 2025
Work includes sanitary sewer improvements project.
AvailableThe major work will consist of the (approximate) following: 5,437 LF of 30" Sewer pipe, 3,070 LF of 27" Sewer Pipe 780 LF of 24" Sewer Pipe, 1,113 LF of 21" Sewer Pipe, 5,514 LF of 18" Sewer Pipe, 6,316 LF of 15" Sewer Pipe, 1,961 LF of 12" Sewer Pipe.
Posted Date
Nov 26, 2025
Due Date
Dec 18, 2025
Release: Nov 26, 2025
Close: Dec 18, 2025
The major work will consist of the (approximate) following: 5,437 LF of 30" Sewer pipe, 3,070 LF of 27" Sewer Pipe 780 LF of 24" Sewer Pipe, 1,113 LF of 21" Sewer Pipe, 5,514 LF of 18" Sewer Pipe, 6,316 LF of 15" Sewer Pipe, 1,961 LF of 12" Sewer Pipe.
Available2023 Sanitary Sewer Project Contract No. 1 - Sun Valley MHP Sanitary Sewer Improvements.
Posted Date
-
Due Date
Dec 16, 2025
Release: -
Close: Dec 16, 2025
2023 Sanitary Sewer Project Contract No. 1 - Sun Valley MHP Sanitary Sewer Improvements.
AvailableWork includes 2 EA project information sign; 1 LS public notification per supplementary general provisions, section 3-11. 2; 1 LS storm water pollution prevention and erosion control; 1 LS traffic control and construction staging; 1 LS sheeting, shoring and bracing design; 1 LS sewer bypass plan and implementation (if required); 1 LS CCTV new sewer lines; 1 LS remove and dispose of existing ac dike (berm); 1 LS remove and dispose of existing PCC sidewalk, curb ramp & driveway ; 1 LS remove and dispose of existing 6" PCC curb and gutter; 6 EA 8" PVC (ps115) astm f679 sewer main includes tracer wire, trenching, shoring and plating; site/trench security and necessary vehicle barriers as required for a full price per cov swr_02, swr-11, swr-12, srf-08a, srf-08b, swr-13, srf-11a,srf-11b,srf- 12,srf-13 & sdrsd wp-01. See outside link.
Posted Date
Dec 1, 2025
Due Date
Jan 28, 2026
Release: Dec 1, 2025
Close: Jan 28, 2026
Work includes 2 EA project information sign; 1 LS public notification per supplementary general provisions, section 3-11. 2; 1 LS storm water pollution prevention and erosion control; 1 LS traffic control and construction staging; 1 LS sheeting, shoring and bracing design; 1 LS sewer bypass plan and implementation (if required); 1 LS CCTV new sewer lines; 1 LS remove and dispose of existing ac dike (berm); 1 LS remove and dispose of existing PCC sidewalk, curb ramp & driveway ; 1 LS remove and dispose of existing 6" PCC curb and gutter; 6 EA 8" PVC (ps115) astm f679 sewer main includes tracer wire, trenching, shoring and plating; site/trench security and necessary vehicle barriers as required for a full price per cov swr_02, swr-11, swr-12, srf-08a, srf-08b, swr-13, srf-11a,srf-11b,srf- 12,srf-13 & sdrsd wp-01. See outside link.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis