Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 2 EA project information sign; 1 LS public notification per supplementary general provisions, section 3-11. 2; 1 LS storm water pollution prevention and erosion control; 1 LS traffic control and construction staging; 1 LS sheeting, shoring and bracing design; 1 LS sewer bypass plan and implementation (if required); 1 LS CCTV new sewer lines; 1 LS remove and dispose of existing ac dike (berm); 1 LS remove and dispose of existing PCC sidewalk, curb ramp & driveway ; 1 LS remove and dispose of existing 6" PCC curb and gutter; 6 EA 8" PVC (ps115) astm f679 sewer main includes tracer wire, trenching, shoring and plating; site/trench security and necessary vehicle barriers as required for a full price per cov swr_02, swr-11, swr-12, srf-08a, srf-08b, swr-13, srf-11a,srf-11b,srf- 12,srf-13 & sdrsd wp-01. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes sanitary sewer improvements project.
Posted Date
Nov 13, 2025
Due Date
Dec 22, 2025
Release: Nov 13, 2025
Close: Dec 22, 2025
Work includes sanitary sewer improvements project.
Available2023 Sanitary Sewer Project Contract No. 1 - Sun Valley MHP Sanitary Sewer Improvements.
Posted Date
-
Due Date
Dec 16, 2025
Release: -
Close: Dec 16, 2025
2023 Sanitary Sewer Project Contract No. 1 - Sun Valley MHP Sanitary Sewer Improvements.
AvailableThe City of Walhalla is soliciting bids for the Water & Sewer Improvements Project - Division IV, which includes installing approximately 3,600 linear feet of 10-inch water lines in the Poplar Springs Road area and related work. The project is to be delivered using Design-Bid-Build; bid documents are available from Summit Engineering Group for a non-refundable fee of $150 per set. Bids are due December 18, 2025 at 2:00 PM local time and questions should be emailed to the project coordinator prior to the bid opening.
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
The City of Walhalla is soliciting bids for the Water & Sewer Improvements Project - Division IV, which includes installing approximately 3,600 linear feet of 10-inch water lines in the Poplar Springs Road area and related work. The project is to be delivered using Design-Bid-Build; bid documents are available from Summit Engineering Group for a non-refundable fee of $150 per set. Bids are due December 18, 2025 at 2:00 PM local time and questions should be emailed to the project coordinator prior to the bid opening.
2022 Sanitary Sewer Improvements Contract No. 5 - Sanitary Sewer Improvements.
Posted Date
-
Due Date
Dec 16, 2025
Release: -
Close: Dec 16, 2025
2022 Sanitary Sewer Improvements Contract No. 5 - Sanitary Sewer Improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis