Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consist of adding an elevator to the rear of the existing City Hall building, replacing the front doors with automated opening doors, and renovating four restrooms to make them ADA compliant.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Senior Center ADA Door Improvements.
Posted Date
Nov 12, 2025
Due Date
Dec 23, 2025
Release: Nov 12, 2025
Close: Dec 23, 2025
Senior Center ADA Door Improvements.
AvailableProject consists of refacing the front of the existing city building. There shall be removal of the existing wood veneer. The new face shall include stone veneer and engineered siding. The existing canopy shall include removal of the existing shingle roofing and soffit and install new metal roofing and metal soffit. Also at the canopy, the columns and beams shall be wrapped with the engineered wood to match the siding.
Posted Date
Nov 19, 2025
Due Date
Jan 26, 2026
Release: Nov 19, 2025
Close: Jan 26, 2026
Project consists of refacing the front of the existing city building. There shall be removal of the existing wood veneer. The new face shall include stone veneer and engineered siding. The existing canopy shall include removal of the existing shingle roofing and soffit and install new metal roofing and metal soffit. Also at the canopy, the columns and beams shall be wrapped with the engineered wood to match the siding.
AvailableWork includes ADA improvements.
Posted Date
Dec 4, 2025
Due Date
Jan 16, 2026
Release: Dec 4, 2025
Close: Jan 16, 2026
Work includes ADA improvements.
Available(1.08-Mi.) Standard Overlay and ADA Improvements: curb and gutter spot repairs (remove and replace), sidewalk removal and replacement for curb ramps for sidewalks (ADA), hot-mix asphalt (HMA) surface removal and replacement (cold milling and inlay), full-depth patches (Class D), drainage structures adjustments and cleaning, new thermoplastic pavement markings raised reflective pavement markers, accessible pedestrian signals (APS) improvements and detector loops. See outside link.
Posted Date
-
Due Date
Jan 16, 2026
Close: Jan 16, 2026
(1.08-Mi.) Standard Overlay and ADA Improvements: curb and gutter spot repairs (remove and replace), sidewalk removal and replacement for curb ramps for sidewalks (ADA), hot-mix asphalt (HMA) surface removal and replacement (cold milling and inlay), full-depth patches (Class D), drainage structures adjustments and cleaning, new thermoplastic pavement markings raised reflective pavement markers, accessible pedestrian signals (APS) improvements and detector loops. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis