Summary
Project includes work to upgrade and improve the existing Jefferson Pump Station, including: 1. Mobilization and demobilization. 2. Temporary erosion and sediment control. 3. Bypass pumping and temporary power. 4. Demolition of existing building, pumps, piping, valves, controls and electrical equipment, removal/replacement of the top slab of the lift station wet well and conversion of the dry/wet well configuration into one wet well with submersible pumps. 5. Recoating of the existing dry/wet well structure. 6. Furnishing and installation of two new submersible pumps with a pumping capacity of 400 gpm per pump. 7. Furnishing and installation of all required piping and appurtenances. 8. Construction of equipment canopy and hoist. 9. Construction of a new electrical rack. 10. Construction of a valve vault with a bypass connection. 11. Construction of all site restoration, including but not limited to fencing, concrete slab, and other general restoration. 12.0 Providing testing, startup, commissioning, and training as specified herein. 13. Providing all associated work as shown on the Plans and within these specifications, for a complete and finalized workable system.