Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The U.S. Army Corps of Engineers - New England District issued a presolicitation for janitorial services at Buffumville Lake (one building) and Hodges Village Dam (two buildings) in Charlton and Oxford, MA. The procurement is a total small-business set-aside under NAICS 561720 (Janitorial Services); solicitation documents were expected to be posted on or about 2026-01-30. The presolicitation was posted on 2026-01-15 and is scheduled to become inactive on 2026-02-13 (no primary solicitation file was available on the SAM.gov page when checked).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The work of this project involves replacing aging HVAC systems and solving issues with thermal comfort at Buffumville Lake, Charlton, MA. Both fan coil units and condensing units shall be replaced with new heat pump systems. New heat pump systems shall be controlled via programmable thermostats. Ventilation air shall be provided to the building through a new energy recovery ventilator. All existing finned tube shall be cleaned, and new finned tube shall be added to the main portion of the building where there is none currently. All existing and new heating hot water piping and domestic hot and cold-water piping shall be insulated.
Posted Date
Dec 22, 2025
Due Date
Jan 26, 2026
Release: Dec 22, 2025
Close: Jan 26, 2026
The work of this project involves replacing aging HVAC systems and solving issues with thermal comfort at Buffumville Lake, Charlton, MA. Both fan coil units and condensing units shall be replaced with new heat pump systems. New heat pump systems shall be controlled via programmable thermostats. Ventilation air shall be provided to the building through a new energy recovery ventilator. All existing finned tube shall be cleaned, and new finned tube shall be added to the main portion of the building where there is none currently. All existing and new heating hot water piping and domestic hot and cold-water piping shall be insulated.
AvailableThis RFP is for janitorial services for the Priest Lake Supervisory Area in Coolin, Idaho.
Posted Date
-
Due Date
Jan 26, 2026
Release: -
Close: Jan 26, 2026
This RFP is for janitorial services for the Priest Lake Supervisory Area in Coolin, Idaho.
AvailableJanitorial services for the Priest Lake Supervisory Area in Coolin, Idaho.
Posted Date
-
Due Date
Jan 26, 2026
Close: Jan 26, 2026
Janitorial services for the Priest Lake Supervisory Area in Coolin, Idaho.
AvailablePark lake dam rehabilitation. Work includes but is not limited to; clearing and grubbing, dewatering of Park Lake, deconstruction of the existing dam, construction of a new dam, new seismic foundation, hydraulic seepage control, road reconstruction, reclamation, and all other work associated with dam rehabilitation and construction.
Posted Date
Jan 15, 2026
Due Date
Feb 16, 2026
Release: Jan 15, 2026
Close: Feb 16, 2026
Park lake dam rehabilitation. Work includes but is not limited to; clearing and grubbing, dewatering of Park Lake, deconstruction of the existing dam, construction of a new dam, new seismic foundation, hydraulic seepage control, road reconstruction, reclamation, and all other work associated with dam rehabilitation and construction.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis