Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of professional services for the study, engineering, design, pre-construction, contract administration, field engineering, inspection, startup, testing, operations, training, and post-startup certification of the James River Treatment Plant Digester and Thickening Building Heating Systems Replacements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Remove contents of and clean the primary anaerobic digester at the Jamestown Wastewater Treatment Plant (WWTP) with solids disposal to the Chautauqua County Landfill.
Posted Date
Jan 15, 2026
Due Date
Feb 5, 2026
Release: Jan 15, 2026
Close: Feb 5, 2026
Remove contents of and clean the primary anaerobic digester at the Jamestown Wastewater Treatment Plant (WWTP) with solids disposal to the Chautauqua County Landfill.
AvailablePerform a full upgrade of the men's and women's locker rooms and exterior painting of facility. The project consists of renovation work at the Central Treatment Plant (CTP), Building A. The scope includes a full upgrade of the men's and women's locker rooms, encompassing demolition of existing finishes and fixtures, installation of new lockers, plumbing fixtures, tile, lighting, and associated architectural and MEP (mechanical, electrical, plumbing) improvements. Additionally, the project includes surface preparation and exterior painting of the building to enhance aesthetics, durability, and protection of the existing metal siding.
Posted Date
Jan 7, 2026
Due Date
Feb 3, 2026
Release: Jan 7, 2026
Close: Feb 3, 2026
Perform a full upgrade of the men's and women's locker rooms and exterior painting of facility. The project consists of renovation work at the Central Treatment Plant (CTP), Building A. The scope includes a full upgrade of the men's and women's locker rooms, encompassing demolition of existing finishes and fixtures, installation of new lockers, plumbing fixtures, tile, lighting, and associated architectural and MEP (mechanical, electrical, plumbing) improvements. Additionally, the project includes surface preparation and exterior painting of the building to enhance aesthetics, durability, and protection of the existing metal siding.
Procurement of Ammonium Sulfate 40% water treatment chemical for the Yadkin River Water Treatment Plant.
Posted Date
-
Due Date
Jan 28, 2026
Release: -
Close: Jan 28, 2026
Procurement of Ammonium Sulfate 40% water treatment chemical for the Yadkin River Water Treatment Plant.
AvailableThis RFP is for the procurement of Sodium Hydroxide 25% for use at the Yadkin River Water Treatment Plant.
Posted Date
-
Due Date
Jan 28, 2026
Release: -
Close: Jan 28, 2026
This RFP is for the procurement of Sodium Hydroxide 25% for use at the Yadkin River Water Treatment Plant.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis