James M Robb SP Island Acres Wastewater Improvements, C26CR1 RFP
James M Robb SP Island Acres Wastewater Improvements, C26CR1
Description: Work includes removal and replacement of the existing submersible pump lift station with a new above ground lift station package, wet well and grinder, removal and replacement of aeration basin liners and evaporation lagoon liners, and associated site work.
StateAgency · CO, US
Adjacent opportunities open for bidding right now.
State AgencyCO
Posted
Nov 16, 2026
Dec 15, 2026
James M Robb SP Island Acres Wastewater Improvements, C26CR1
CityMI
Posted
Nov 20, 2026
Dec 11, 2026
The project as a whole include lagoon bank improvements at the wastewater treatment facility, and all related work. Site work & excavation; biosolids removal. See attached files.
Grape Creek Independent School District
School DistrictTX
Posted
Nov 9, 2026
Dec 3, 2026
Installation of an Infiltrator ECOPOD package wastewater treatment plant to replace the existing wastewater treatment plant. Scope includes a new SCADA system, miscellaneous site improvements, and additional yard piping, valves, meters and fittings, for a complete operational treatment plant and abandonment of the existing plant. Alternate bid items include a lift station replacement with associated features and a new force main.
CityIA
Posted
-
Dec 17, 2026
New headworks building (pre-cast concrete) with mechanically cleaned stair screen, screenings washing and compactor, stacked tray grit removal, grit washing, and submersible raw wastewater influent pumps new 4 cell sequencing batch reactor (SBR) treatment process new post treatment building (pre-cast concrete) with tertiary filters (pile cloth) and UV disinfection new biosolids complex building (pre-cast concrete) with rotary drum thickener and sludge pumping new 0.75 MG sludge storage tank (pre-stressed concrete) new operations building (pre-engineered metal building) with blowers (rotary screw), air compressors, compressed air storage tanks, electrical room, mechanical room, lab and control room, and locker room facilities new maintenance building (Bid Alternate A), a pre-engineered metal building demolition of existing plant facilities and structures site grading, paving, structure excavation, underground utilities, and other site civil works electrical work including a new stand-by generator, power and controls, and new SCADA system HVAC and plumbing work for all new buildings all other work as required by the plans and specifications.