Summary
Seeking a contractor to replace the cooling system that serves the jail. Contractor shall disconnect, remove, and properly dispose of existing cooling system, which consists of two (2) 60-ton trane rauc air-cooled condensers and trane two-piece dx coils, including all components and all related accessories. The existing cooling system will be replaced with a chiller or equivalent cooling solution along with the coils and all necessary components to complete respective contractor's scope. The contractor shall ensure that the existing support structure is load worthy for equipment being proposed or offer alternative solution for location of replacement equipment.