Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
U.S. Army Engineer District Jacksonville
This solicitation requests maintenance dredging in Jacksonville Harbor, including Base work on Bar Cut-3 through Cut-17 and an Option A for Cut-55 through the Lower Terminal Channel, with disposal to ODMDS Zone C1 or Bartram Island DMMA Cell F. The work requires turbidity monitoring, endangered species observers (hopper dredges), marine animal and bird monitoring, and disposal area pumpout, and demands U.S. Coast Guard certified dredge equipment where applicable. The contract is split into a base and one option, with a required start within 60 calendar days of Notice to Proceed and completion of work within 150 calendar days.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
U.S. Army Engineer District Jacksonville
Work consist of maintenance dredging, the contract base element consists of maintenance dredging between portions of bar cut-3 station 198+00 to cut-17 station 0+00.
Posted Date
Jun 27, 2025
Due Date
Jan 27, 2026
Release: Jun 27, 2025
U.S. Army Engineer District Jacksonville
Close: Jan 27, 2026
Work consist of maintenance dredging, the contract base element consists of maintenance dredging between portions of bar cut-3 station 198+00 to cut-17 station 0+00.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Marshall
Work includes approx. 4,676 LF of 8" Diameter SDR-17 (Class 250) PVC Water Main; 7 EA of 8" Gate Valve; 4,140 LF of 1" HDPE Service Line; 270 LF of 8" Paved Driveway Crossing; 11,527 SF of Cut-Ins & Connections to Existing Water Mains. See outside link.
Posted Date
Dec 3, 2025
Due Date
Dec 18, 2025
Release: Dec 3, 2025
City of Marshall
Close: Dec 18, 2025
Work includes approx. 4,676 LF of 8" Diameter SDR-17 (Class 250) PVC Water Main; 7 EA of 8" Gate Valve; 4,140 LF of 1" HDPE Service Line; 270 LF of 8" Paved Driveway Crossing; 11,527 SF of Cut-Ins & Connections to Existing Water Mains. See outside link.
AvailableCity of Lake Jackson
Work includes New 9.25 MGD lift station; 18” ID circular wet well with Canopy Covering and Trolley Hoist; 3 submersible pumps with VFDs; New CMU Electrical Building; New Generator Site Improvements, Grading, and Paving; Installation of 24” HDPE (DR-17) force main by open-cut and trenchless methods; Furnish and Install thirteen (13) 2” combination air release/ vacuum valves; Furnish and Install four (4) 24” direct bury plug valves; Furnish and Install 6" Force Main Lateral including 6" Plug Valve, 2" CAV, 6" MJ End Cap, Couplings, Fittings Tees, Concrete Structure, and Backfill Material; Furnish and Install 2" Force Main Lateral including 2" Plug Valve, 2" CTS Compression End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Furnish and Install 3" Force Main Lateral including 3" Plug Valve, 3" MJ End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Including but not limited to, clearing and grubbing, hydromulch and seeding, dewatering, hydrostatic testing, and pavement replacement; Demolition of existing lift station.;
Posted Date
Nov 23, 2025
Due Date
Jan 21, 2026
Release: Nov 23, 2025
City of Lake Jackson
Close: Jan 21, 2026
Work includes New 9.25 MGD lift station; 18” ID circular wet well with Canopy Covering and Trolley Hoist; 3 submersible pumps with VFDs; New CMU Electrical Building; New Generator Site Improvements, Grading, and Paving; Installation of 24” HDPE (DR-17) force main by open-cut and trenchless methods; Furnish and Install thirteen (13) 2” combination air release/ vacuum valves; Furnish and Install four (4) 24” direct bury plug valves; Furnish and Install 6" Force Main Lateral including 6" Plug Valve, 2" CAV, 6" MJ End Cap, Couplings, Fittings Tees, Concrete Structure, and Backfill Material; Furnish and Install 2" Force Main Lateral including 2" Plug Valve, 2" CTS Compression End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Furnish and Install 3" Force Main Lateral including 3" Plug Valve, 3" MJ End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Including but not limited to, clearing and grubbing, hydromulch and seeding, dewatering, hydrostatic testing, and pavement replacement; Demolition of existing lift station.;
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →