Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
U.S. Army Engineer District Jacksonville
Work consist of maintenance dredging, the contract base element consists of maintenance dredging between portions of bar cut-3 station 198+00 to cut-17 station 0+00.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
U.S. Army Engineer District Jacksonville
This solicitation requests maintenance dredging in Jacksonville Harbor, including Base work on Bar Cut-3 through Cut-17 and an Option A for Cut-55 through the Lower Terminal Channel, with disposal to ODMDS Zone C1 or Bartram Island DMMA Cell F. The work requires turbidity monitoring, endangered species observers (hopper dredges), marine animal and bird monitoring, and disposal area pumpout, and demands U.S. Coast Guard certified dredge equipment where applicable. The contract is split into a base and one option, with a required start within 60 calendar days of Notice to Proceed and completion of work within 150 calendar days.
Posted Date
Nov 25, 2025
Due Date
Jan 27, 2026
Release: Nov 25, 2025
U.S. Army Engineer District Jacksonville
Close: Jan 27, 2026
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
This solicitation requests maintenance dredging in Jacksonville Harbor, including Base work on Bar Cut-3 through Cut-17 and an Option A for Cut-55 through the Lower Terminal Channel, with disposal to ODMDS Zone C1 or Bartram Island DMMA Cell F. The work requires turbidity monitoring, endangered species observers (hopper dredges), marine animal and bird monitoring, and disposal area pumpout, and demands U.S. Coast Guard certified dredge equipment where applicable. The contract is split into a base and one option, with a required start within 60 calendar days of Notice to Proceed and completion of work within 150 calendar days.
AvailableU.S. Army Engineer District Savannah
The brunswick harbor entrance channel advanced maintenance widener o&m dredging contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. Approximately two million cubic yards of maintenance material is expected to be removed from the advanced maintenance wideners and adjacent entrance channel.
Posted Date
Sep 26, 2025
Due Date
Dec 19, 2025
Release: Sep 26, 2025
U.S. Army Engineer District Savannah
Close: Dec 19, 2025
The brunswick harbor entrance channel advanced maintenance widener o&m dredging contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. Approximately two million cubic yards of maintenance material is expected to be removed from the advanced maintenance wideners and adjacent entrance channel.
AvailableU.S. Army Engineer District New Orleans
The work consists of furnishing one fully crewed and equipped hydraulic pipeline cutterhead dredge for the removal and satisfactory disposal of shoal material in the River Bay, Bar, and Crewboat Cut Channel.
Posted Date
Apr 2, 2024
Due Date
Apr 22, 2026
Release: Apr 2, 2024
U.S. Army Engineer District New Orleans
Close: Apr 22, 2026
The work consists of furnishing one fully crewed and equipped hydraulic pipeline cutterhead dredge for the removal and satisfactory disposal of shoal material in the River Bay, Bar, and Crewboat Cut Channel.
AvailableU.S. Army Engineering and Support Center, Huntsville
Harbor maintenance dredging. Remove approx. 180,000 CY of accumulated sediment across the three project features.
Posted Date
Oct 17, 2025
Due Date
Nov 5, 2028
Release: Oct 17, 2025
U.S. Army Engineering and Support Center, Huntsville
Close: Nov 5, 2028
Harbor maintenance dredging. Remove approx. 180,000 CY of accumulated sediment across the three project features.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →