Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installing approx. 350 LF of 16" of DI, CL250 pipe, 300 LF of 16” HDPE DR 21 pipe, 380 LF of directional bore for 16" HDPE, DR-21 pipe with 24" HDPE, DR 21 encasement, a vacuum priming vault, floating intake structure and all other necessary appurtenances to complete project
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Seeking proposals from qualified professional engineering consulting firms to submit proposals to provide services, including, but not limited to, planning, engineering evaluations and design, permitting, and engineering services during construction of their raw water intake system and associated infrastructure.
Posted Date
Sep 10, 2025
Due Date
Jan 23, 2026
Release: Sep 10, 2025
Close: Jan 23, 2026
Seeking proposals from qualified professional engineering consulting firms to submit proposals to provide services, including, but not limited to, planning, engineering evaluations and design, permitting, and engineering services during construction of their raw water intake system and associated infrastructure.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of two rivers raw water intake and transmission.
Posted Date
Jan 8, 2026
Due Date
Feb 5, 2026
Release: Jan 8, 2026
Close: Feb 5, 2026
Work consists of two rivers raw water intake and transmission.
AvailableUpgrade the hydroburst system for the raw water intake system located in the raw water intake system.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Upgrade the hydroburst system for the raw water intake system located in the raw water intake system.
AvailableConsists of removing an existing 4” waterline, encasement, and hanger system from the Highway 110 Little Red River Bridge, installing a new 6” waterline across the Little Red River by boring the river, tying in the new waterline to existing facilities, and replacement of the system's raw water intake screen and suction pipe.
Posted Date
Jan 9, 2026
Due Date
Jan 29, 2026
Release: Jan 9, 2026
Close: Jan 29, 2026
Consists of removing an existing 4” waterline, encasement, and hanger system from the Highway 110 Little Red River Bridge, installing a new 6” waterline across the Little Red River by boring the river, tying in the new waterline to existing facilities, and replacement of the system's raw water intake screen and suction pipe.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →