Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Harris County (Harris County Flood Control District) solicits bids for channel erosion repairs and channel improvements along Pillot Gully (Project ID: K140-00-00-X025), including backslope interceptor structures, riprap replacement, slope repairs, pipe removal/replacement, SWPPP measures, and associated construction work. Bidders must meet bonding, insurance, prevailing wage, MWBE participation and safety certification requirements; bids are due Dec 22, 2025 (see dueTo), and the contract completion time is 240 calendar days with liquidated damages for delay.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Harris County (Harris County Flood Control District) solicits bids for channel erosion repairs and channel improvements along Pillot Gully (Project ID: K140-00-00-X025), including backslope interceptor structures, riprap replacement, slope repairs, pipe removal/replacement, SWPPP measures, and associated construction work. Bidders must meet bonding, insurance, prevailing wage, MWBE participation and safety certification requirements; bids are due Dec 22, 2025 (see dueTo), and the contract completion time is 240 calendar days with liquidated damages for delay.
Posted Date
Nov 28, 2025
Due Date
Dec 22, 2025
Release: Nov 28, 2025
Close: Dec 22, 2025
Harris County (Harris County Flood Control District) solicits bids for channel erosion repairs and channel improvements along Pillot Gully (Project ID: K140-00-00-X025), including backslope interceptor structures, riprap replacement, slope repairs, pipe removal/replacement, SWPPP measures, and associated construction work. Bidders must meet bonding, insurance, prevailing wage, MWBE participation and safety certification requirements; bids are due Dec 22, 2025 (see dueTo), and the contract completion time is 240 calendar days with liquidated damages for delay.
AvailableThe Harris County Flood Control District issued an Invitation to Bid for major repairs to Brays Bayou (Project ID D100-00-00-X134) to enhance flood control infrastructure and public facility integrity. The contract covers site construction, traffic control, concrete sidewalks, chain link fences and gates, and other related work to be performed in accordance with HCFCD and City of Houston specifications.
Posted Date
-
Due Date
Dec 22, 2025
Close: Dec 22, 2025
The Harris County Flood Control District issued an Invitation to Bid for major repairs to Brays Bayou (Project ID D100-00-00-X134) to enhance flood control infrastructure and public facility integrity. The contract covers site construction, traffic control, concrete sidewalks, chain link fences and gates, and other related work to be performed in accordance with HCFCD and City of Houston specifications.
Provide construction services for the river walk channel improvements: staircase and sidewalks.
Posted Date
Dec 4, 2025
Due Date
Jan 27, 2026
Release: Dec 4, 2025
Close: Jan 27, 2026
Provide construction services for the river walk channel improvements: staircase and sidewalks.
AvailableThe primary objective of Package #8 Segment 4 East E2 Clinton (E2C) consists of constructing an upland dredged material confined placement area (DMPA) to receive maintenance dredging material from future dredging Project 11 - Segment 4. The scope of work include clearing, grubbing and stripping; grading; construction of outfall channels, drainage channels, perimeter ditching and other drainage features; perimeter embankment construction; drop outlet structure construction; erosion control measures; site security measures; geotechnical construction testing; topographic surveys before the start of construction, and during and after construction activities; placement of topsoil, and hydromulch seeding; demobilization and site cleanup; and related ancillary work.
Posted Date
Nov 26, 2025
Due Date
Jan 8, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The primary objective of Package #8 Segment 4 East E2 Clinton (E2C) consists of constructing an upland dredged material confined placement area (DMPA) to receive maintenance dredging material from future dredging Project 11 - Segment 4. The scope of work include clearing, grubbing and stripping; grading; construction of outfall channels, drainage channels, perimeter ditching and other drainage features; perimeter embankment construction; drop outlet structure construction; erosion control measures; site security measures; geotechnical construction testing; topographic surveys before the start of construction, and during and after construction activities; placement of topsoil, and hydromulch seeding; demobilization and site cleanup; and related ancillary work.
Available