Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
6,200 LF 8" PVC c909 water main (pressure class 235); 4,385 ton bit. Pavement; 16,000 LF concrete curb & gutter (f-4); 610 LF concrete curb & gutter m-opening (f-4).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement of services for street reconstruction and water main installation on Drake St., Campau Dr., and Norwood Dr. in Midland, Michigan.
Posted Date
-
Due Date
Dec 23, 2025
Close: Dec 23, 2025
Procurement of services for street reconstruction and water main installation on Drake St., Campau Dr., and Norwood Dr. in Midland, Michigan.
AvailablePremium
Access the largest public sector contact database
The City of Mission, Kansas is soliciting sealed bids for its 2026 Street Reconstruction Projects, covering reconstruction of selected city streets with curb and gutter and associated stormwater improvements. A pre-bid conference is scheduled, and bids are due on January 5, 2026 at 10:00 a.m.
Posted Date
Dec 3, 2025
Due Date
Jan 5, 2026
Release: Dec 3, 2025
Close: Jan 5, 2026
The City of Mission, Kansas is soliciting sealed bids for its 2026 Street Reconstruction Projects, covering reconstruction of selected city streets with curb and gutter and associated stormwater improvements. A pre-bid conference is scheduled, and bids are due on January 5, 2026 at 10:00 a.m.
AvailableThe existing roadway pavement will be removed and replaced with PCC pavement, which will include the preparation of subbase material. Storm sewer piping will be added, storm sewer structures will be replaced and added, and watermain will be updated under a portion of the project corridor. Sanitary Sewer services along Giles Street will be replaced on an as needed basis. Affected driveway approaches will be replaced, all sidewalk will be replaced, and sidewalk curb ramps will be modified to be ADA compliant. A portion of watermain will be updated and upsized. The project also includes surface restoration, traffic control and other related work.
Posted Date
Nov 21, 2025
Due Date
Dec 17, 2025
Release: Nov 21, 2025
Close: Dec 17, 2025
The existing roadway pavement will be removed and replaced with PCC pavement, which will include the preparation of subbase material. Storm sewer piping will be added, storm sewer structures will be replaced and added, and watermain will be updated under a portion of the project corridor. Sanitary Sewer services along Giles Street will be replaced on an as needed basis. Affected driveway approaches will be replaced, all sidewalk will be replaced, and sidewalk curb ramps will be modified to be ADA compliant. A portion of watermain will be updated and upsized. The project also includes surface restoration, traffic control and other related work.
AvailableProject includes approx 1,307 CY of Roadway Excavation; 5,937 SY of Asphaltic Concrete (3" Thick); 5,638 SY of Asphaltic Concrete (1.5" Thick) (Overlay); 5,638 SY of Cold Planing Asphaltic Pavement (1.5"); 392 LF of Concrete Curb (Barrier) (2' Wide); 53 SY of Driveways (6" Thick); 1,135 LF of Sawcutting. See outside link.
Posted Date
Aug 12, 2025
Due Date
Dec 23, 2025
Release: Aug 12, 2025
Close: Dec 23, 2025
Project includes approx 1,307 CY of Roadway Excavation; 5,937 SY of Asphaltic Concrete (3" Thick); 5,638 SY of Asphaltic Concrete (1.5" Thick) (Overlay); 5,638 SY of Cold Planing Asphaltic Pavement (1.5"); 392 LF of Concrete Curb (Barrier) (2' Wide); 53 SY of Driveways (6" Thick); 1,135 LF of Sawcutting. See outside link.