Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Calvert County Government issued ITB 2026-031 for Newtown Road Stream Restoration, requiring clearing, grubbing, erosion and sediment control, outfall channel restoration, traffic maintenance, staking, mobilization, and other construction tasks. The project duration is 120 working days and requires bid, labor/materials, and performance bonds plus relevant licenses and insurance. Mandatory pre-bid meeting and site visit are scheduled for 2025-12-22, with questions due 2025-12-23 and bid close date 2026-01-08.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes 1875 LF of stream restoration including excavation, grading, slope stabilization fabric, erosion and sedimentation controls, landscape restoration, vegetated coir log, riparian buffer plants, replacement of existing retaining wall, and all necessary appurtenances and restoration for said construction.
Posted Date
Dec 11, 2025
Due Date
Jan 22, 2026
Release: Dec 11, 2025
Close: Jan 22, 2026
Work includes 1875 LF of stream restoration including excavation, grading, slope stabilization fabric, erosion and sedimentation controls, landscape restoration, vegetated coir log, riparian buffer plants, replacement of existing retaining wall, and all necessary appurtenances and restoration for said construction.
Premium
Access the largest public sector contact database
Work will involve streambank grading and stabilization, in-stream structures, and erosion and sediment control measures, per guidelines to be given at the mandatory site showing.
Posted Date
Dec 5, 2025
Due Date
Jan 23, 2026
Release: Dec 5, 2025
Close: Jan 23, 2026
Work will involve streambank grading and stabilization, in-stream structures, and erosion and sediment control measures, per guidelines to be given at the mandatory site showing.
AvailableThe City of Chico is seeking bids for the 2026 Road Rehabilitation - Ceanothus Avenue Project, involving full depth reclamation of Ceanothus Avenue from Manzanita Avenue to East Avenue, including curb, gutter, sidewalk, curb ramps, residential and commercial driveways, bulb outs, sanitary sewer laterals, landscaping, storm drain drop inlets, and striping improvements. The project includes a new driveway on East Avenue into Pleasant Valley High School and an Engineer's Estimate of approximately $1,855,712. Bidders must pay prevailing wages, hold the required contractor license (Class A or combination), and complete the work within a 60-working-day contract time.
Posted Date
Dec 11, 2025
Due Date
Jan 14, 2026
Release: Dec 11, 2025
Close: Jan 14, 2026
The City of Chico is seeking bids for the 2026 Road Rehabilitation - Ceanothus Avenue Project, involving full depth reclamation of Ceanothus Avenue from Manzanita Avenue to East Avenue, including curb, gutter, sidewalk, curb ramps, residential and commercial driveways, bulb outs, sanitary sewer laterals, landscaping, storm drain drop inlets, and striping improvements. The project includes a new driveway on East Avenue into Pleasant Valley High School and an Engineer's Estimate of approximately $1,855,712. Bidders must pay prevailing wages, hold the required contractor license (Class A or combination), and complete the work within a 60-working-day contract time.
AvailableProvide construction services for the reconstruction of existing storm drain inlets, concrete curbing, and sidewalks.
Posted Date
Dec 5, 2025
Due Date
Jan 7, 2026
Release: Dec 5, 2025
Close: Jan 7, 2026
Provide construction services for the reconstruction of existing storm drain inlets, concrete curbing, and sidewalks.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis