Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work will involve streambank grading and stabilization, in-stream structures, and erosion and sediment control measures, per guidelines to be given at the mandatory site showing.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide construction services for the reconstruction of existing storm drain inlets, concrete curbing, and sidewalks.
Posted Date
Dec 5, 2025
Due Date
Jan 7, 2026
Release: Dec 5, 2025
Close: Jan 7, 2026
Provide construction services for the reconstruction of existing storm drain inlets, concrete curbing, and sidewalks.
AvailablePremium
Access the largest public sector contact database
Work includes 1875 LF of stream restoration including excavation, grading, slope stabilization fabric, erosion and sedimentation controls, landscape restoration, vegetated coir log, riparian buffer plants, replacement of existing retaining wall, and all necessary appurtenances and restoration for said construction.
Posted Date
Dec 11, 2025
Due Date
Jan 22, 2026
Release: Dec 11, 2025
Close: Jan 22, 2026
Work includes 1875 LF of stream restoration including excavation, grading, slope stabilization fabric, erosion and sedimentation controls, landscape restoration, vegetated coir log, riparian buffer plants, replacement of existing retaining wall, and all necessary appurtenances and restoration for said construction.
AvailableProvide construction services for the liberty street creek restoration project.
Posted Date
Dec 2, 2025
Due Date
Dec 23, 2025
Release: Dec 2, 2025
Close: Dec 23, 2025
Provide construction services for the liberty street creek restoration project.
AvailableRestore a total of 6,380 LF of Parkway Creek located along the Capital Area Greenbelt, 6,380 linear feet of restoration planned across all phases, Phase 4 includes approximately 1,744 linear feet of stream restoration. Of the 1,744 linear feet, the project is broken down into 3 sub-phases, Phase 4A, 4B, and 4C. The Phase 4 stream restoration work includes: streambank grading to create floodplain reconnection; installing bank treatments, including boulder packing, to protect existing adjacent park infrastructure and stabilize mature trees; installing riparian plantings along the stream corridor.
Posted Date
Dec 10, 2025
Due Date
Dec 23, 2025
Release: Dec 10, 2025
Close: Dec 23, 2025
Restore a total of 6,380 LF of Parkway Creek located along the Capital Area Greenbelt, 6,380 linear feet of restoration planned across all phases, Phase 4 includes approximately 1,744 linear feet of stream restoration. Of the 1,744 linear feet, the project is broken down into 3 sub-phases, Phase 4A, 4B, and 4C. The Phase 4 stream restoration work includes: streambank grading to create floodplain reconnection; installing bank treatments, including boulder packing, to protect existing adjacent park infrastructure and stabilize mature trees; installing riparian plantings along the stream corridor.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis