Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 39 street light poles with dual arms & fixtures, 2" PVC conduits & ground boxes for street light poles & signal interconnect, 2 electrical service meter pedestals, conductors to complete street light circuits.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work includes but is not limited to all labor, materials, tools, oversight, dewatering controls, work area safety measures, and mobilization required to provide e&s controls and complete the stream restoration scope including: in-stream grading, gravel bar removal, purchase and installation of timber log protection, storm pipe, inlet, grading for floodplain mitigation features, landscaping, and all other related site work.
Posted Date
Jan 8, 2026
Due Date
Feb 2, 2026
Release: Jan 8, 2026
Close: Feb 2, 2026
The work includes but is not limited to all labor, materials, tools, oversight, dewatering controls, work area safety measures, and mobilization required to provide e&s controls and complete the stream restoration scope including: in-stream grading, gravel bar removal, purchase and installation of timber log protection, storm pipe, inlet, grading for floodplain mitigation features, landscaping, and all other related site work.
AvailableThis RFP is for the full reconstruction of 25th Street, Phase II, including roadway milling, demolition, curb, sidewalk, ADA curb ramps, driveway approaches, site restoration, and mobilization.
Posted Date
Jan 2, 2026
Due Date
Jan 29, 2026
Release: Jan 2, 2026
Close: Jan 29, 2026
This RFP is for the full reconstruction of 25th Street, Phase II, including roadway milling, demolition, curb, sidewalk, ADA curb ramps, driveway approaches, site restoration, and mobilization.
AvailableThe City of Seguin is soliciting bids for Phase II drainage improvements along Mays Creek. The work includes constructing a single‑span arch structure, modular block retaining walls, and channel widening, along with associated roadway and drainage features. Bids are due January 13, 2026 at 3:00 PM CST via the City’s BidNet Direct portal.
Posted Date
Oct 29, 2025
Due Date
Jan 13, 2026
Release: Oct 29, 2025
Close: Jan 13, 2026
The City of Seguin is soliciting bids for Phase II drainage improvements along Mays Creek. The work includes constructing a single‑span arch structure, modular block retaining walls, and channel widening, along with associated roadway and drainage features. Bids are due January 13, 2026 at 3:00 PM CST via the City’s BidNet Direct portal.
AvailableProcurement of construction services for the Creek County Sheriff, EOC Phase II project.
Posted Date
-
Due Date
Jan 12, 2026
Close: Jan 12, 2026
Procurement of construction services for the Creek County Sheriff, EOC Phase II project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →