Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide hvac replacement. Replacement of existing ground source heat pump system in its entirety. Replacement of existing water source heat pumps with new hydronic 4-pipe blower coil units. Replacement of exiting water source energy recovery units with new energy recovery units. Removal of all ground source piping. Removal and replacement of existing boiler system and mechanical room piping with a new boiler plant, chiller plant, pumps and controls. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
2 EA of 1-1/2" Ips 90° Flanged elbow: 1-1/2" ips 90° flange elbow, grooved flange x sil brazed, astm b505, c90300. 700 psi wog - 1050 psi test - 160 degree f (max). pc no 1507 of dwg: 255389 rev d. casting material: astm-b505, c90300 supersedes qq-c-390, d-5.
Posted Date
Jan 21, 2026
Due Date
Jan 30, 2026
Release: Jan 21, 2026
Close: Jan 30, 2026
2 EA of 1-1/2" Ips 90° Flanged elbow: 1-1/2" ips 90° flange elbow, grooved flange x sil brazed, astm b505, c90300. 700 psi wog - 1050 psi test - 160 degree f (max). pc no 1507 of dwg: 255389 rev d. casting material: astm-b505, c90300 supersedes qq-c-390, d-5.
AvailableHvac replacement
Posted Date
Nov 25, 2025
Due Date
Jan 27, 2026
Release: Nov 25, 2025
Close: Jan 27, 2026
Hvac replacement
AvailableThe project consists of: removal and replacement of rooftop HVAC equipment at Oster elementary school.
Posted Date
Dec 29, 2025
Due Date
Feb 10, 2026
Release: Dec 29, 2025
Close: Feb 10, 2026
The project consists of: removal and replacement of rooftop HVAC equipment at Oster elementary school.
AvailableRelease: Jan 13, 2026
Close: Feb 10, 2026
HVAC equipment replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis