Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of recon- structing and widening road to three lanes a 7.5 pedestrian path will be constructed on both the north and and the relocation and burying of irrigation facilities. In addition, the bridge and the culvert will be replaced and constructed to a 5-lane section for future expansion. Work includes, 27,600 CY of excavation; 23,705 TON of granular subbase; 13,545 TON of 3/4" aggregate type B for base; 6,825 TON of superpave hma pavement including asphalt & additive class sp-3; 7,740 SY of sidewalk; 1,246 SF of anti-graffiti coating; 602 SY of concrete waterproof system type e; 516 CY of loose riprap; 258 SY of riprap/erosion control geotextile; 670 CY of geosynthetic reinforced abutment backfill; 152 SY of textured concrete surface.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: Dec 10, 2025
Close: Dec 30, 2025
Install (2) road plates.
AvailableCity of Pasco requests SOQs from Washington-registered civil engineering consultants to serve as Engineer of Record and provide project management and engineering services for the Road 40 E Extension, including topographic survey, PS&E development, environmental permitting (NEPA/SEPA), ROW acquisition as needed, public outreach, bidding support, and construction management/administration.
Posted Date
Nov 24, 2025
Due Date
Dec 18, 2025
Release: Nov 24, 2025
Close: Dec 18, 2025
City of Pasco requests SOQs from Washington-registered civil engineering consultants to serve as Engineer of Record and provide project management and engineering services for the Road 40 E Extension, including topographic survey, PS&E development, environmental permitting (NEPA/SEPA), ROW acquisition as needed, public outreach, bidding support, and construction management/administration.
AvailableClose: Feb 15, 2026
Road reconstruction - 2 lane.
AvailableDresurfacing east grafton rd east grafton rd.
Posted Date
Dec 2, 2025
Due Date
Jan 13, 2026
Release: Dec 2, 2025
Close: Jan 13, 2026
Dresurfacing east grafton rd east grafton rd.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis