Frederick Water
Frederick Water is soliciting bids to construct approximately 1,900 linear feet of 20‑inch raw water pipeline, including a jack‑and‑bore crossing under a road and railroad with about 137 linear feet installed in steel casing. The project also includes modifications to interconnections at a pump station and a water treatment plant at each end of the new line.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Town of North Wilkesboro
Proposed project generally includes construction of approx. 15,000 LF of 20" raw water line, pedestrian bridge, valves, restoration and all related appurtenances. The proposed 20" raw water line is proposed to cross the yadkin river at three (3) locations, and the reddies river at one (1) location, along the proposed route. 1 LS mobilization; 50 LF 20" dip class 350 raw water line; 1,325 LF 20" dip class 350 restrained joint raw water line; 10,210 LF 20" dip class 250 raw water line; 1,960 LF 20" dip class 250 restrained joint raw water line; 3 EA 20" gate valve and box; 220 LF 36" dia. X 0.50" thick steel encasement by bore and jack with 20" dip rj carrier pipe; 6 EA 2" combination air/vacuum release valves; 23,020 LBS compact ductile iron fittings. See attached file.
Posted Date
Sep 12, 2025
Due Date
Nov 20, 2025
Release: Sep 12, 2025
Town of North Wilkesboro
Close: Nov 20, 2025
Proposed project generally includes construction of approx. 15,000 LF of 20" raw water line, pedestrian bridge, valves, restoration and all related appurtenances. The proposed 20" raw water line is proposed to cross the yadkin river at three (3) locations, and the reddies river at one (1) location, along the proposed route. 1 LS mobilization; 50 LF 20" dip class 350 raw water line; 1,325 LF 20" dip class 350 restrained joint raw water line; 10,210 LF 20" dip class 250 raw water line; 1,960 LF 20" dip class 250 restrained joint raw water line; 3 EA 20" gate valve and box; 220 LF 36" dia. X 0.50" thick steel encasement by bore and jack with 20" dip rj carrier pipe; 6 EA 2" combination air/vacuum release valves; 23,020 LBS compact ductile iron fittings. See attached file.
AvailableCity of La Porte
Construction of 18" diameter raw water main as well as a portion of sanitary sewer, as well as asphalt, curb, and sidewalk restoration where applicable.
Posted Date
Nov 5, 2025
Due Date
Nov 25, 2025
Release: Nov 5, 2025
City of La Porte
Close: Nov 25, 2025
Construction of 18" diameter raw water main as well as a portion of sanitary sewer, as well as asphalt, curb, and sidewalk restoration where applicable.
AvailableCalvert County
Project consist of 12" LF, furnish and install PVC restrained joint water main; 12" LF, furnish and install directionally drilled pipeline; furnish and install air release valve; 20 CY, contingent unclassified excavation; 20 TN, contingent porous fill #57 stone; 20 TN, contingent CR-6 (crusher run) graded aggregate; 10 CY, contingent miscellaneous concrete; 10 TN, contingent hotmix asphalt pavement; 50 CY, contingent off-site borrow. See attached files and outside link.
Posted Date
Aug 15, 2025
Due Date
Nov 20, 2025
Release: Aug 15, 2025
Calvert County
Close: Nov 20, 2025
Project consist of 12" LF, furnish and install PVC restrained joint water main; 12" LF, furnish and install directionally drilled pipeline; furnish and install air release valve; 20 CY, contingent unclassified excavation; 20 TN, contingent porous fill #57 stone; 20 TN, contingent CR-6 (crusher run) graded aggregate; 10 CY, contingent miscellaneous concrete; 10 TN, contingent hotmix asphalt pavement; 50 CY, contingent off-site borrow. See attached files and outside link.
AvailableCity of Dayton
The City of Dayton Department of Public Works is soliciting electronic bids via QuestCDN (eBidDoc #9929894) for the 36-inch Raw Water Main within the Miami Wellfield, Phase 3 project with a 5% MBE participation goal. Bids are due at 12:00 PM (noon) EST on December 4, 2025; a virtual pre‑bid conference is scheduled for November 18, 2025.
Posted Date
Nov 10, 2025
Due Date
Dec 4, 2025
Release: Nov 10, 2025
City of Dayton
Close: Dec 4, 2025
The City of Dayton Department of Public Works is soliciting electronic bids via QuestCDN (eBidDoc #9929894) for the 36-inch Raw Water Main within the Miami Wellfield, Phase 3 project with a 5% MBE participation goal. Bids are due at 12:00 PM (noon) EST on December 4, 2025; a virtual pre‑bid conference is scheduled for November 18, 2025.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis