North Broward Hospital District
Special DistrictFL
Posted
Sep 24, 2026
Nov 18, 2026
Broward Health Imperial Point Roof Repair and Replacement *Re-bid* RFP
Roof Repair and Replacement.
Description: Invitation to Bid for roof repair and replacement services at Broward Health Imperial Point.
SpecialDistrict · FL, US
From the first pre-RFP signals to the published RFP and its files.
Budget
394 days before RFP
The FY2026 final capital budget lists $1,225,000 for BHIP Routine Capital - Infrastructure.
BROWARD HEALTH CAPITAL BUDGET FY 2026 Description Total Final Budget FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 5 Year Project Total BHIT Willow upgrade 500,000 - - - - 500,000 BHIT Network Endpoint Switches 500,000 - - - - 500,000 BHIT Wifi / AP Wiring (Used for new drops) (Low-bid) 500,000 - - - - 500,000 BHIT Wiring across the district (Remaining equipment)…
Broward Health FY2026 Budget
Budget · Sep 22, 2025
Budget
26 days before RFP
The FY2027 final capital budget lists $7,625,000 for BHIP Routine Capital - Infrastructure.
BROWARD HEALTH CAPITAL BUDGET FY 2027 Description Total Final Budget FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 5 Year Project Total BHIT Laptop/Desktop End of Life Refresh/iPads 2,000,000 - - - - 2,000,000 BHIT Network requirements across sites 1,250,000 - - - - 1,250,000 BHIT Network Endpoint Switches 500,000 - - - - 500,000 BHIT Wifi / AP Wiring (Used for…
RFP published
Proposals due (7 days left)
Broward Health FY2027 Budget
Budget · Sep 25, 2026
Decision makers connected to this RFP from North Broward Hospital District.
Adjacent opportunities open for bidding right now.
North Broward Hospital District
Special DistrictFL
Posted
Sep 24, 2026
Nov 18, 2026
Roof Repair and Replacement.
Washougal School District 112-6
School DistrictWA
Posted
Oct 16, 2026
Nov 17, 2026
High school chiller replacement. Alternate #1 consists of replacing the existing secondary loop pumps, the air/dirt separator, and the existing expansion tank for the chilled water loop, alternate #2 consists of replacing the underground piping between the mechanical yard and the boiler room. Pipe replacement will require trenching, pipe removal and replacement, backfill, and surface repair.
CityMA
Posted
Nov 4, 2026
Nov 30, 2026
Partial removal of 18 inch concrete pipe install of 18-inch class III concrete pipe repair of pavement surrounding 2 manhole covers replacement of guardrail panel
Snohomish County Housing Authority
Special DistrictWA
Posted
-
Dec 1, 2026
Replacement of existing water, sewer, and electrical utilities and roadway asphalt.