Summary
Work inlcudes 1 LS installation and modifications to the existing mechanical trash rack assembly including inlet grating structure; anchorage; patching holes; clean up, all appurtenances and miscellaneous equipment; hydromulch seeding of all disturbed areas; 1 LS at the inlet of drainage channel, construct one (1) 10kw diesel stand-by generator with 24 hour subbase fuel tank, weatherproof and sound attenuation enclosure; generator slab & insulation; (1) automatic transfer switch (ats); install local signal control panel, service equipment, transducers, terminal boxes, solar panels, grounding system, antenna pole; construct 100 lf of wooden fence, manual swing access gate around the electrical equipment; modifications to existing electrical and controls. See attached file.