CityTX
Posted
Oct 27, 2026
Nov 24, 2026
Converse Toepperwein Road Improvements Project RFP
Work includes pavement widening, bus pads, curb, sidewalk, drainage, pavement markings, signage, topsoil, seeding, and all other appurtenances necessary to complete the project. 28,412 SF remove concrete sidewalks & driveways ; 7,637 SF remove miscellaneous concrete ; 17,439 CY street excavation; 163 CY box culvert excavation and backfill; 32,654 SY hot mix asph pave type b (8" comp depth)(20% max rap)(no ras)(pg64-22); 30,532 SY salvaging, hauling, and stockpiling reclaimable asphaltic pave (3" depth). See attached file.