Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The County of Santa Barbara is soliciting bids to construct two offsite groundwater monitoring wells and eight onsite soil vapor extraction wells at the SEMCO site (2936 Industrial Parkway, Santa Maria, CA). The contractor must furnish all labor, materials, and equipment and hold a California well drilling contractor C-57 license; the project duration is 45 calendar days and the estimated cost is about $150,000. Questions are due prior to bid closing; contact listed is Edward Teyber (tedteyber@countyofsb.org; (909) 851-3430).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
The work includes drilling, soil sampling, and groundwater sampling at five designated locations with potential contamination concerns. The contractor will provide all labor, equipment, materials, and support necessary to complete borings, install test wells, collect samples, and prepare the required report.
Posted Date
Dec 5, 2025
Due Date
Dec 30, 2025
Release: Dec 5, 2025
Close: Dec 30, 2025
The work includes drilling, soil sampling, and groundwater sampling at five designated locations with potential contamination concerns. The contractor will provide all labor, equipment, materials, and support necessary to complete borings, install test wells, collect samples, and prepare the required report.
AvailableDes Moines Water Works is soliciting contractors to perform drilling, soil sampling, groundwater sampling, installation of test wells, and to prepare a comprehensive report for a limited Phase II Environmental Site Assessment at five specified locations. The contractor must provide all labor, equipment, materials, and support and perform work in accordance with the project plans and specifications. The solicitation is for procurement of environmental investigation services (not a grant) and is estimated between $50,000 and $150,000.
Posted Date
Dec 5, 2025
Due Date
Dec 30, 2025
Release: Dec 5, 2025
Close: Dec 30, 2025
Des Moines Water Works is soliciting contractors to perform drilling, soil sampling, groundwater sampling, installation of test wells, and to prepare a comprehensive report for a limited Phase II Environmental Site Assessment at five specified locations. The contractor must provide all labor, equipment, materials, and support and perform work in accordance with the project plans and specifications. The solicitation is for procurement of environmental investigation services (not a grant) and is estimated between $50,000 and $150,000.
Work includes mothballing and removal of the as/sve trailer and transport to a site specified by egle; emptying of two gac vessels and transport to a location selected by egle; disconnection and transport of the catalytic oxidizer (catox) to a location selected by egle; removal and disposal of the as/sve underground components (including plumbing, piping, and infiltration gallery); proper abandonment of the on-and offsite monitoring wells and associated protective covers; proper abandonment of the on-and offsite soil gas monitoring points and associated protective covers; demolition and disposal of the onsite shed and fence; site restoration.
Posted Date
Nov 10, 2025
Due Date
Dec 17, 2025
Release: Nov 10, 2025
Close: Dec 17, 2025
Work includes mothballing and removal of the as/sve trailer and transport to a site specified by egle; emptying of two gac vessels and transport to a location selected by egle; disconnection and transport of the catalytic oxidizer (catox) to a location selected by egle; removal and disposal of the as/sve underground components (including plumbing, piping, and infiltration gallery); proper abandonment of the on-and offsite monitoring wells and associated protective covers; proper abandonment of the on-and offsite soil gas monitoring points and associated protective covers; demolition and disposal of the onsite shed and fence; site restoration.
Lump sum ls mobilization; lump sum ls construction surveying; lump sum ls clearing & grubbing. . Acre(s); 1 acr supplementary clearing & grubbing; 2 ea sealing abandoned wells; 5,200 cy unclassified excavation; 4,250 cy undercut excavation; 74,000 cy borrow excavation; 61. 9 cy drainage ditch excavation; 1,030 sy removal of existing asphalt pavement; 1,030 sy breaking of existing asphalt pavement; 4,050 cy select granular material; 5,550 sy geotextile for soil stabilization; 1,915 sf temporary shoring; 180 sy rock plating; lump sum ls generic grading item; type 2 bridge approach fill, station 119+69. 55 -y-; 390 ton foundation conditioning material, minor structures. See attached file for full scope.
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Close: Dec 16, 2025
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis
Lump sum ls mobilization; lump sum ls construction surveying; lump sum ls clearing & grubbing. . Acre(s); 1 acr supplementary clearing & grubbing; 2 ea sealing abandoned wells; 5,200 cy unclassified excavation; 4,250 cy undercut excavation; 74,000 cy borrow excavation; 61. 9 cy drainage ditch excavation; 1,030 sy removal of existing asphalt pavement; 1,030 sy breaking of existing asphalt pavement; 4,050 cy select granular material; 5,550 sy geotextile for soil stabilization; 1,915 sf temporary shoring; 180 sy rock plating; lump sum ls generic grading item; type 2 bridge approach fill, station 119+69. 55 -y-; 390 ton foundation conditioning material, minor structures. See attached file for full scope.
Available