Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Michigan Department of Technology, Management and Budget
Work includes mothballing and removal of the as/sve trailer and transport to a site specified by egle; emptying of two gac vessels and transport to a location selected by egle; disconnection and transport of the catalytic oxidizer (catox) to a location selected by egle; removal and disposal of the as/sve underground components (including plumbing, piping, and infiltration gallery); proper abandonment of the on-and offsite monitoring wells and associated protective covers; proper abandonment of the on-and offsite soil gas monitoring points and associated protective covers; demolition and disposal of the onsite shed and fence; site restoration.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Rhode Island Office of Energy Resources
Provide construction of a remedial cap, environmental oversight, and closure documentation.
Posted Date
Nov 4, 2025
Due Date
Dec 4, 2025
Release: Nov 4, 2025
Rhode Island Office of Energy Resources
Close: Dec 4, 2025
Provide construction of a remedial cap, environmental oversight, and closure documentation.
AvailableMichigan Department of Technology, Management and Budget
DESIGN-BUILD - Best value design-build project: reconstruction of i-94/i-69, m-25 connector, bridge interchange and ramps to accommodate the reconfiguration of the blue water bridge plaza including new bridge construction and bridge replacements, and the demolition and construction of buildings in the city. This project contains a 5 year warranty for new/reconstructed jointed plain concrete pavement, a 2 year bridge coating warranty and a 2 year warranty on concrete surface coating.
Posted Date
Jul 24, 2025
Due Date
Dec 19, 2025
Release: Jul 24, 2025
Michigan Department of Technology, Management and Budget
Close: Dec 19, 2025
DESIGN-BUILD - Best value design-build project: reconstruction of i-94/i-69, m-25 connector, bridge interchange and ramps to accommodate the reconfiguration of the blue water bridge plaza including new bridge construction and bridge replacements, and the demolition and construction of buildings in the city. This project contains a 5 year warranty for new/reconstructed jointed plain concrete pavement, a 2 year bridge coating warranty and a 2 year warranty on concrete surface coating.
Louisiana Division of Administration
Remedial investigation.
Posted Date
Oct 10, 2025
Due Date
Dec 3, 2025
Release: Oct 10, 2025
Louisiana Division of Administration
Close: Dec 3, 2025
Remedial investigation.
AvailableMississippi Interlocal Purchasing System (MIPS)
Excavation, grading
Posted Date
Oct 27, 2025
Due Date
Nov 20, 2025
Release: Oct 27, 2025
Mississippi Interlocal Purchasing System (MIPS)
Close: Nov 20, 2025
Excavation, grading
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis