StateMT
Posted
Nov 23, 2026
Nov 30, 2026
Intent to Sole Source Lentocilin
DPHHS is considering a request from the Director's Office to award a Sole Source contract to Mark Cuban Cost Plus Drug Company
Description: 1. Description of Requirement The United States Coast Guard (USCG), Director of Operational Logistics (DOL) / Contracting Activity, announces its intent to negotiate and award a sole-source contract modification/task order to Design and Production, Inc. (D&P), located at 7110 Rainwater Place, Lorton, VA 22079. This requirement encompasses the final phase of comprehensive professional design refinement, fabrication, delivery, systems integration, and on-site installation services necessary to achieve full operational readiness for the permanent exhibitions of the National Coast Guard Museum (NCGM) prior to its scheduled grand opening in 2027. The scope of work under this action includes, but is not limited to: Exhibit Fabrication: Precision fabrication and final assembly of specialized, museum-grade physical exhibits, interactive displays, and artifact mounts. Archival Case Integration & Security: Structural fabrication, microclimate control integration, and multi-tier physical and electronic security systems integration across seventy (70) custom archival display cases. Graphics & Digital Production: Final production and high-resolution imaging of environmental typography, historical imagery, and large-format digital artwork. Integrated Site Installation & Coordination: Comprehensive on-site installation management, including specialized theatrical and conservation exhibit lighting, structured low-voltage signal cabling, audiovisual network backbone integration, and critical structural alignment with the base-building prime architectural and engineering design. 2. Statutory Authority and Rationale for Sole-Source Award The statutory authority permitting this sole-source acquisition is 41 U.S.C. 3304(a)(1), as implemented by FAR 6.302-1(a)(2)(iii): "Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements" for the continuation of highly specialized services. Key Justification Factors: Unacceptable Delays to Mission Schedule: Design and Production, Inc. has served as the sole prime contractor responsible for the preceding conceptual, schematic, and detailed engineering phases of the NCGM exhibits. A transition to any other vendor at this critical milestone would necessitate a re-baselining of engineering drawings, building interfaces, and vendor tooling, causing an estimated 12- to 18-month operational delay. This delay would directly jeopardize the congressionally and publicly recognized 2027 opening timeline. Substantial Duplication of Cost: Onboarding a new contractor would require complete engineering re-validation, structural interface re-certification, project management re-mobilization, and redesign of seventy (70) integrated archival display cases. The Government estimates that this transition would result in $5,000,000 to $7,000,000 in duplicated costs that cannot be expected to be recovered through competitive procurement. Integrated Technical Liability & Proprietary Fit: D&P possesses preexisting proprietary structural calculations, digital assets, and tooling specifications engineered directly into the museum's ongoing physical construction. Introducing a separate fabrication contractor at this terminal phase creates severe contractual warranty and liability fractures regarding case tolerances and museum environmental performance. 3. Notice to Industry (Pursuant to FAR 5.207(c)(16)(ii)) THIS SYNOPSIS IS PUBLISHED FOR INFORMATIONAL PURPOSES ONLY AND DOES NOT CONSTITUTE COMPETITIVE SOLICITATION OR A REQUEST FOR COMPETITIVE PROPOSALS (RFP). No formal solicitation document is available. A determination by the Government not to compete this proposed action based upon responses to this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purpose of determining whether to conduct competitive procurement in the future. 4. Capability Statement Submission Criteria All responsible sources may submit a capability statement that demonstrates the technical capability and capacity to fulfill the requirements described herein. To be considered substantive, capability statements must provide clear, convincing, and documented evidence addressing each of the following mandatory criteria: Seamless Assumption of Structural Liability: Detailed demonstration of how the respondent could immediately adopt, validate, and assume full structural and environmental liability for the existing design packages and proprietary display case engineering without voiding existing warranties or requiring baseline redesign. Archival & Security Integration Experience: Documented past performance (within the past five years) delivering turnkey fabrication and security integration for at least fifty (50) high-security museum display cases conforming to federal preservation and security standards. Schedule Feasibility: A detailed milestone and transition schedule demonstrating the ability to mobilize immediately, complete all fabrication, and achieve full operational turnover in alignment with the fixed 2027 museum commissioning date without schedule slippage. Cost Duplication Mitigation: A verifiable plan demonstrating how the vendor would eliminate or absorb the estimated $5M$7M duplication in engineering, tooling, and facility coordination expenses without passing these costs to the Government. 5. Submission Details & Instructions Response Deadline: [Insert Date, minimum 15 calendar days from posting, e.g., Month DD, YYYY at 4:00 PM EST] Submission Format: Responses must be submitted electronically in searchable PDF format (maximum [e.g., 1015] pages, 11-point font minimum). Proprietary information must be clearly marked. Point of Contact (POC): Contracting Officer: domingo.cruz2@uscg.mil Telephonic inquiries and capability statements delivered after the deadline will not be accepted or evaluated.
Federal · DC, US
Adjacent opportunities open for bidding right now.
StateMT
Posted
Nov 23, 2026
Nov 30, 2026
DPHHS is considering a request from the Director's Office to award a Sole Source contract to Mark Cuban Cost Plus Drug Company
Federal
Posted
Nov 19, 2026
Nov 30, 2027
The Defense Health Agency Contracting Activity Healthcare Contracting Division, Falls Church (DHACA-HCD-FC), plans to award a firm fixed price sole source contract to Steriliz, LLC for Steriliz IN-TRAX Software License, Cloud Access, Maintenance, and Technical Support.
Posted
Nov 19, 2026
Nov 30, 2026
The Defense Health Agency Contracting Activity Healthcare Contracting Division plans a firm-fixed-price, sole-source award to Steriliz, LLC for IN-TRAX software licensing, cloud access, maintenance, and technical support. The service covers five Rapid Disinfector ultraviolet-C systems at Dwight D. Eisenhower Army Medical Center in Fort Gordon, including software updates, system maintenance, troubleshooting, and remote support. This is a notice of intent rather than a request for competitive proposals; interested parties may submit capability statements by email by November 30, 2026, and the government may decide whether to compete based on the responses.
Federal
Posted
Nov 18, 2026
Dec 3, 2026
This is not a solicitation, and quotes are not being accepted at the moment. The 355th Contracting Squadron intends to award a sole-source multiple year indefinite quantity contract to Flightsafety International Inc for Gulfstream G550 Pilot Training. The reultant solicitation and award will be made in accordance with RFO 12.102(a) for the procurement of the following items: Total contract value is estimated less than the Simplified Acquisition threshold of $350K. 0001 Initial Pilot Training - 1.4.1.1. 0002 Refresher Pilot Training - 1.4.1.2. 0003 Pilot Proficiency Training - 1.4.1.3. 0004 RNP AR Pilot Training - 1.4.2.1. 0005 Pilot Recurrent International Procedure Course - 1.4.2.2. 0006 Reject Takeoff Pilot Training - 1.4.2.3. 0007 Upset Prevention Initial Training - 1 .4.2.4. 0008 Energy Management Training - 1.4.2.5. 0009 ADSB and CPDLC Training - 1.4.2.6. 0010 Supplementary Simulator Training - 1.4.1.4. All interested parties must respond no later than 12/03/2026 at 12:00pm MST to SrA Judah Morton at judah.morton@us.af.mil and Michael Orchowski at michael.orchowski@us.af.mil . Responses received will be reviewed in detail; however, a determination by the Government not to compete the proposed procurement based upon responses to this notice is solely at the discretion of the Government. Information received will be reviewed solely for the purpose of determining whether to conduct a competitive procurement or not. The 355th Contracting Office will not reimburse parties for any costs connected with providing capability information. Attachments: Sole Source Justification
Decision makers connected to this RFP from U.S. Coast Guard.
Original attachments and procurement documents tied to this bid.