Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of West Haven
Work includes excavation and removal of existing storm drainage piping and structures; procurement and installation of new storm drainage piping and structures; procurement and installation of new water quality structures; procurement and installation of new infiltration galleries; procurement and installation of all required fittings, geotextile fabrics, and stone materials; backfilling and proper compaction of all trenches and excavations; restoration of the site, including paving, landscaping, and other surface features.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Hahira
Construct the storm drainage improvements including +/- 554 LF of 36" RCP, +/- 610 LF of 30" RCP, +/- 409 LF of 4" perforated pipe with sock, 6" PVC water line lowering, drainage structures, erosion control, grassing, and all other appurtenances necessary to complete the project.
Posted Date
Nov 14, 2025
Due Date
Dec 18, 2025
Release: Nov 14, 2025
City of Hahira
Close: Dec 18, 2025
Construct the storm drainage improvements including +/- 554 LF of 36" RCP, +/- 610 LF of 30" RCP, +/- 409 LF of 4" perforated pipe with sock, 6" PVC water line lowering, drainage structures, erosion control, grassing, and all other appurtenances necessary to complete the project.
AvailableCity of Waterbury
This project will upgrade a portion of the existing drainage system. There will be approx. 130' of 24" pipe installed and 5 new drainage structures constructed. Also, a new ez-block retaining wall will be constructed to support the existing failing stone wall on street. A portion of the existing driveway will be repaved and new curbing will be installed. Modified riprap will be installed on the slope and grass will be established on disturbed areas. See outside link.
Posted Date
Nov 14, 2025
Due Date
Dec 17, 2025
Release: Nov 14, 2025
City of Waterbury
Close: Dec 17, 2025
This project will upgrade a portion of the existing drainage system. There will be approx. 130' of 24" pipe installed and 5 new drainage structures constructed. Also, a new ez-block retaining wall will be constructed to support the existing failing stone wall on street. A portion of the existing driveway will be repaved and new curbing will be installed. Modified riprap will be installed on the slope and grass will be established on disturbed areas. See outside link.
AvailableCity of Wheat Ridge
The base bid includes remove and replace approx 13 LF of 12" hdpe and installing a 48" dia manhole. Provide bypass pumping and dewatering. Clean and camera 4", 8" and 12" hdpe storm pipes. Minor landscaping, remove & replace asphalt, remove & replace sidewalk and curb & gutter. Install concrete rundowns and sidewalk chases, provide erosion control. Bid alternates include single spot pipe repair for several scenarios and cured in place pipe if applicable.
Posted Date
Oct 21, 2025
Due Date
Nov 20, 2025
Release: Oct 21, 2025
City of Wheat Ridge
Close: Nov 20, 2025
The base bid includes remove and replace approx 13 LF of 12" hdpe and installing a 48" dia manhole. Provide bypass pumping and dewatering. Clean and camera 4", 8" and 12" hdpe storm pipes. Minor landscaping, remove & replace asphalt, remove & replace sidewalk and curb & gutter. Install concrete rundowns and sidewalk chases, provide erosion control. Bid alternates include single spot pipe repair for several scenarios and cured in place pipe if applicable.
AvailableBorough of Bay Head
Removal and disposal of 144 LF +/- existing storm drainage pipe and storm drainage manholes, installation of 144 LF of 12" DIP class 52 with storm sewer manholes, installation of wapro inline check valve, unclassified excavation, permanent pavement restoration, site restoration and all related work.
Posted Date
Nov 12, 2025
Due Date
Nov 25, 2025
Release: Nov 12, 2025
Borough of Bay Head
Close: Nov 25, 2025
Removal and disposal of 144 LF +/- existing storm drainage pipe and storm drainage manholes, installation of 144 LF of 12" DIP class 52 with storm sewer manholes, installation of wapro inline check valve, unclassified excavation, permanent pavement restoration, site restoration and all related work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis