Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
In a 14' x 14' space located within a park and near the playground (exact location to be determined), remove existing turfgrass and regrade area, performing any necessary excavation to ensure concrete pad is level and plumb. Pour concrete pad and install a single-tier 24-gauge steel shelter.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Fresno is issuing a contract for the Trolley Park Lighting and Shade Structure project. The scope of work includes furnishing and installing new perimeter site lighting and a shade sail over existing play equipment. The contract must be completed within seventy (70) working days from the notice to proceed.
Posted Date
Dec 16, 2025
Due Date
Jan 13, 2026
Release: Dec 16, 2025
Close: Jan 13, 2026
The City of Fresno is issuing a contract for the Trolley Park Lighting and Shade Structure project. The scope of work includes furnishing and installing new perimeter site lighting and a shade sail over existing play equipment. The contract must be completed within seventy (70) working days from the notice to proceed.
Premium
Access the largest public sector contact database
Shade structure.
Posted Date
Dec 2, 2025
Due Date
Jan 29, 2026
Release: Dec 2, 2025
Close: Jan 29, 2026
Shade structure.
AvailableWork consist of remove and dispose of existing shade structures, supply and install yellow shade sail fabric (25' x 35'), supply and install red shade umbrella (12' x 12'), supply and install blue hip roof shade (10' x 20').
Posted Date
Dec 3, 2025
Due Date
Dec 30, 2025
Release: Dec 3, 2025
Close: Dec 30, 2025
Work consist of remove and dispose of existing shade structures, supply and install yellow shade sail fabric (25' x 35'), supply and install red shade umbrella (12' x 12'), supply and install blue hip roof shade (10' x 20').
AvailableProcurement of a Super Span Hip Shade Structure and removal of an existing island roof structure for a playground and swing set area.
Posted Date
-
Due Date
Dec 30, 2025
Release: -
Close: Dec 30, 2025
Procurement of a Super Span Hip Shade Structure and removal of an existing island roof structure for a playground and swing set area.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis