Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes the purchase and installation of a submerged aeration system at Wish for a Fish Pond. The aeration system specified for this project is for a system compatible with 120V or 240V single-phase power.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Operations is soliciting proposals from ESCOs to provide energy service and improvements on the LBWRP existing aeration system, which includes PACs, air distribution piping, diffusers, baffles, mixers, biotrickling filters, associated instrumentation and controls, foam spray, and other improvements at the plant (“Aeration System”) that can save energy, reduce costs, increase production of recycled water, and ensure continued compliance with increasingly stringent regulatory requirements (“Services”). For this RFP, “ESCO” refers to any entity qualified to provide a turn-key utility conservation program that includes the services and requirements set forth in this RFP.
Posted Date
Oct 15, 2025
Due Date
Jan 27, 2026
Premium
Access the largest public sector contact database
Close: Jan 27, 2026
Operations is soliciting proposals from ESCOs to provide energy service and improvements on the LBWRP existing aeration system, which includes PACs, air distribution piping, diffusers, baffles, mixers, biotrickling filters, associated instrumentation and controls, foam spray, and other improvements at the plant (“Aeration System”) that can save energy, reduce costs, increase production of recycled water, and ensure continued compliance with increasingly stringent regulatory requirements (“Services”). For this RFP, “ESCO” refers to any entity qualified to provide a turn-key utility conservation program that includes the services and requirements set forth in this RFP.
AvailableWork include construction of new watermains, appurtenances, water service lines, meter vaults, installation of water meters, and installation of new water tank aeration system to improve and extend the town's existing water distribution system.
Posted Date
Nov 26, 2025
Due Date
Dec 18, 2025
Release: Nov 26, 2025
Close: Dec 18, 2025
Work include construction of new watermains, appurtenances, water service lines, meter vaults, installation of water meters, and installation of new water tank aeration system to improve and extend the town's existing water distribution system.
AvailableThe existing aeration basin is a four-quadrant rectangular concrete structure with diffuser aeration system in all quadrants. This project involves replacement of aeration diffuser grid system in two quadrants of the four quadrant aeration basin. Replacement includes aeration piping, fittings, supports, diffusers and all appurtenances.
Posted Date
Dec 4, 2025
Due Date
Jan 8, 2026
Release: Dec 4, 2025
Close: Jan 8, 2026
The existing aeration basin is a four-quadrant rectangular concrete structure with diffuser aeration system in all quadrants. This project involves replacement of aeration diffuser grid system in two quadrants of the four quadrant aeration basin. Replacement includes aeration piping, fittings, supports, diffusers and all appurtenances.
AvailableDESIGN-BUILD. Multi-campus sound system design and installation.
Posted Date
Sep 15, 2025
Due Date
Jan 30, 2026
Release: Sep 15, 2025
Close: Jan 30, 2026
DESIGN-BUILD. Multi-campus sound system design and installation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis