Install Bridge Crane at Joint National Guard BGS # 3100 Field Maintenance Shop (FMS#1)

Description: Project consists of the installation of a 15-ton bridge crane in Area B of the existing facility. The crane system shall include bridge rails, bridge trolley, hoist, power and control circuit conductors, safety and control mechanisms, and all other parts and services as defined in the drawings & specifications. There are multiple Alternate Bid Items contained in this project. All work to be performed IAW plans and specifications developed by WSP USA Buildings, Inc. The contract shall designate the Substantial Completion Date on or before 30 September 2027, and the Contract Final Completion Date on or before 15 November 2027.

Buyer
Released
Oct 16, 2026
Closes
Dec 3, 2026(28 days left)