Summary
The work generally consists of the removal and replacement of approx. 22 existing clay sanitary sewer lateral lines (quantity is an estimate for bidding purposes only; actual quantities may vary and will be paid on a unit price basis) with 4” PVC. Each lateral line is required to have tracer wire, a standard backflow preventer, and sewer cleanouts every 100 LF. Each new service should be tapped onto the sewer main with a standard 4” tap and saddle. The Contractor shall connect the new service to the existing home plumbing at the most suitable location, as determined by the City, 6" to 2 FT outside the house foundation.