Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work consists of installation of new water main and connections. Further includes 1 LS clearing and grubbing; 50' curb removed; 1 EA valve box removed; 22 CY asphalt concrete base, pg64-22; 104 CY aggregate base; 12 gal non-tracking tack coat, 0.06 gal/s. Y; 11 CY 2" asphalt concrete surface course, type 1; 10' fence replaced in-kind (chainlink); 50' curb and gutter replaced (in-kind); 200' 4" conduit, type b, 707. 45, storm repair; 200' 6" conduit, type b, 707. 45, storm repair; 25' 10" conduit, type c, 706. 02, storm repair; 25' 10" conduit, type c, 707. 33, storm repair. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construction of the following Project: Industrial Park #1 Water Improvements. The Project includes the following approx quantities of work: 1. 5,500 LF of 12" water main. 2. 1,000 LF of 10” through 6" water main. 3. 54 Service Assemblies.
Posted Date
Oct 30, 2025
Due Date
Jan 5, 2026
Release: Oct 30, 2025
Close: Jan 5, 2026
Construction of the following Project: Industrial Park #1 Water Improvements. The Project includes the following approx quantities of work: 1. 5,500 LF of 12" water main. 2. 1,000 LF of 10” through 6" water main. 3. 54 Service Assemblies.
AvailableThe site development including and installation of a new water tower. Work includes approx. 1 LS 3,000,000 Gal composite elevated water storage tank, 20 CY additional concrete for footings, 20 CY additional excavation, 1 LS clearing & grubbing, 85 CY aggregate base, 18 Gal non-tracking tack coat, 640 FT fence, 53 SF 5" concrete sidewalk, 50 LF 4" conduit storm repair, 225 LF 6" PVC SDR-35 sanitary sewer,242 LF 16" water main, 1 EA 16" butterfly valve, 1 EA 6" fire hydrant, 4,250 SY seeding & mulching, 5,000 EA erosion control, 1 Allow SCADA system.
Posted Date
Dec 15, 2025
Due Date
Jan 8, 2026
Release: Dec 15, 2025
Close: Jan 8, 2026
The site development including and installation of a new water tower. Work includes approx. 1 LS 3,000,000 Gal composite elevated water storage tank, 20 CY additional concrete for footings, 20 CY additional excavation, 1 LS clearing & grubbing, 85 CY aggregate base, 18 Gal non-tracking tack coat, 640 FT fence, 53 SF 5" concrete sidewalk, 50 LF 4" conduit storm repair, 225 LF 6" PVC SDR-35 sanitary sewer,242 LF 16" water main, 1 EA 16" butterfly valve, 1 EA 6" fire hydrant, 4,250 SY seeding & mulching, 5,000 EA erosion control, 1 Allow SCADA system.
Work consists of water systems improvements - phase 3.
Posted Date
Nov 20, 2025
Due Date
Jan 29, 2026
Release: Nov 20, 2025
Close: Jan 29, 2026
Work consists of water systems improvements - phase 3.
AvailableConstruction of phase 1 including all utilities, storm drainage, water and wastewater pipe and appurtenances; excavation and embankment; street improvements including curbs and hmac; water quality ponds; erosion & sedimentation controls; and various other improvements. Approx. 3,000 LF 8" PVC C-900, DR-14 Potable Waterline; 48 LF 12" Ductile Iron Pipe Waterline; 14 EA 8" Gate Valve with Box and Cover; 17 Ea Fire Hydrant Assembly; 1,790 LF 8" PVC SDR-26 Gravity Wastewater Line (10'-12' depth);
Posted Date
Nov 26, 2025
Due Date
Jan 7, 2026
Release: Nov 26, 2025
Close: Jan 7, 2026
Construction of phase 1 including all utilities, storm drainage, water and wastewater pipe and appurtenances; excavation and embankment; street improvements including curbs and hmac; water quality ponds; erosion & sedimentation controls; and various other improvements. Approx. 3,000 LF 8" PVC C-900, DR-14 Potable Waterline; 48 LF 12" Ductile Iron Pipe Waterline; 14 EA 8" Gate Valve with Box and Cover; 17 Ea Fire Hydrant Assembly; 1,790 LF 8" PVC SDR-26 Gravity Wastewater Line (10'-12' depth);
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis