Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The site development including and installation of a new water tower. Work includes approx. 1 LS 3,000,000 Gal composite elevated water storage tank, 20 CY additional concrete for footings, 20 CY additional excavation, 1 LS clearing & grubbing, 85 CY aggregate base, 18 Gal non-tracking tack coat, 640 FT fence, 53 SF 5" concrete sidewalk, 50 LF 4" conduit storm repair, 225 LF 6" PVC SDR-35 sanitary sewer,242 LF 16" water main, 1 EA 16" butterfly valve, 1 EA 6" fire hydrant, 4,250 SY seeding & mulching, 5,000 EA erosion control, 1 Allow SCADA system.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of the following Project: Industrial Park #1 Water Improvements. The Project includes the following approx quantities of work: 1. 5,500 LF of 12" water main. 2. 1,000 LF of 10” through 6" water main. 3. 54 Service Assemblies.
Posted Date
Oct 30, 2025
Due Date
Jan 5, 2026
Release: Oct 30, 2025
Close: Jan 5, 2026
Construction of the following Project: Industrial Park #1 Water Improvements. The Project includes the following approx quantities of work: 1. 5,500 LF of 12" water main. 2. 1,000 LF of 10” through 6" water main. 3. 54 Service Assemblies.
AvailablePremium
Access the largest public sector contact database
Work consists of water systems improvements - phase 3.
Posted Date
Nov 20, 2025
Due Date
Jan 29, 2026
Release: Nov 20, 2025
Close: Jan 29, 2026
Work consists of water systems improvements - phase 3.
AvailablePark renovations including playground equipment replacement and new rubberized safety surfacing, new park shelter, concrete flatwork and trail, site furnishings, landscaping and electrical. Add Alternate includes remodel of existing park restroom building.
Posted Date
Dec 11, 2025
Due Date
Jan 16, 2026
Release: Dec 11, 2025
Close: Jan 16, 2026
Park renovations including playground equipment replacement and new rubberized safety surfacing, new park shelter, concrete flatwork and trail, site furnishings, landscaping and electrical. Add Alternate includes remodel of existing park restroom building.
AvailableWork includes Traffic Control Plan Design & Installation, Right of Way Preparation,Irrigation Repair, Connect to Existing Water Line; 3951 LF of F&I 8" C-900 PVC Water Line By Open Cut; 10 LF of F&I 16" Steel Casing Pipe, F&I Fire Hydrant Assembly 10 ea, 35 SY of Remove & Replace 6" Concrete Driveway Pavement; 90 LF of Remove & Replace Curb and Gutter; 20 LF of Remove & Replace Sanitary Sewer with 8" Pressure Rated PVC Pipe. See attached file.
Posted Date
-
Due Date
Dec 30, 2025
Close: Dec 30, 2025
Work includes Traffic Control Plan Design & Installation, Right of Way Preparation,Irrigation Repair, Connect to Existing Water Line; 3951 LF of F&I 8" C-900 PVC Water Line By Open Cut; 10 LF of F&I 16" Steel Casing Pipe, F&I Fire Hydrant Assembly 10 ea, 35 SY of Remove & Replace 6" Concrete Driveway Pavement; 90 LF of Remove & Replace Curb and Gutter; 20 LF of Remove & Replace Sanitary Sewer with 8" Pressure Rated PVC Pipe. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis